
27
Installation
13.2 Supplying Gas
Before you begin:
•
Ensure the fireplace is off and cool before servicing
• Ensure the gas supply is turned OFF and disconnect the power supply (including backup batteries)
Step 1:
Run the gas line to the rear, right side of the fireplace.
Step 2:
A 3/8" pipe is connected to the gas valve and extends
outside the back side of the fireplace (see
Figure 13.2.02
).
Connect the gas line to the pipe and tighten.
Step 3:
Turn on the gas to the appliance and check for leaks.
Figure 13.2.01:
Gasline
Figure 13.2.02:
Содержание 45-DVFE28LN-1
Страница 66: ...NOTES ...
Страница 68: ......