
7
Installation
5.0 Installation Checklist
This standard installation checklist is to be used by the installer in conjunction with, not instead of, the instructions contained
within this installation manual.
Customer:
Date Installed:
Install Address:
Location of Fireplace:
Installer:
Appliance Install: (Section 9.0)
YES
IF NO, WHY NOT?
Verified that the chase is insulated and sealed.
Standoffs, side nailing flanges, and top nailing flange extension are installed.
Fireplace is leveled and secured.
Venting: (Section 10.0)
YES
IF NO, WHY NOT?
Venting configuration complies with vent diagrams.
Venting installed and secured in place maintaining proper clearances.
Maintained 1/4" rise for every 1 ft. on horizontal run.
Terminations installed and sealed in compliance with local building code.
Direct vent termination is highest point in vent assembly.
Wiring / Electrical: (Section 7.0)
YES
IF NO, WHY NOT?
Connected to household 110/120v per local codes.
Unit is properly grounded.
Gas: (Section 13.0)
YES
IF NO, WHY NOT?
Proper appliance for fuel type?
Was a conversion performed?
Leak check performed & inlet and manifold pressures verified?
Verified proper air shutter setting?
Finishing (Section 12.0):
YES
IF NO, WHY NOT?
Only noncombustible material installed in noncombustible areas.
Clearances meet installation manual requirements.
Mantels and/or projections comply with install manual.
Appliance Setup:
YES
IF NO, WHY NOT?
Burner media / log set, glass door, and screen installed according to install
manual.
Manual given to home owner.
Did you check operation of lights, fans, and flame modulation?
Comments:
Содержание 37-DVTE30LN-1
Страница 76: ......