
44
Installation
Step 7:
Place smaller embers along the front of Log 2. Do not
block burner openings or the gap along the front of the burner.
Figure 16.1.07:
Note:
DO NOT block the larger burner openings with embers.
Figure 16.1.08:
Step 8:
The platinum embers can be found in the manual bag.
Figure 16.1.09:
Step 9:
Pull apart the platinum embers to spread them.
Figure 16.1.10:
DO NOT BLOCK
Step 4:
Continue spreading embers along the burner openings.
DO NOT
block the gap around the burner or larger burner
openings as they supply air to the fireplace.
DO NOT BLOCK
Figure 16.1.06:
Step 5:
Place Log 2 on the pins located on the right side of the
burner.
Figure 16.1.05:
2
Содержание 37-DVTE30LN-1
Страница 76: ......