
30
Installation
Checking The Gas Pressure
1. Remove the surround.
2.
The pressure test taps are located on the valve. The taps are located in the gas valve front face. The inlet is marked ‘IN’ and the
outlet is marked ‘OUT’. See Below.
3. Loosen the set screw inside the tap with a screwdriver.
4.
Connect a 1/4” (6 mm) rubber tube to the tap post and a manometer.
5.
Verify that the readings obtained are within specs (as shown on the appliance rating plate)
6.
Be sure to tighten the set screw inside the tap after you have finished taking pressure readings.
7. Check for leaks.
Checking And Adjusting The Pilot
Fig. 29-A
Fig. 29-B
Fig. 29-C
Содержание 31-DVIM33C-2
Страница 26: ...26 Operation Operation Lighting Instructions On Rating Plate...
Страница 38: ...NOTES...
Страница 39: ...NOTES...
Страница 40: ......