![Aquatica Digital 20086 Series Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/aquatica-digital/20086-series/20086-series_manual_2961822020.webp)
20 |
Surveyor board and Vacuum pump
Surveyor board and Vacuum pump
Your AZ6/7 housing comes standard with the Surveyor board and a vacuum
valve factory installed.
Surveyor board
The surveyor board has two independent sub-systems, a moisture detection
system and a vacuum monitoring system.
To insert your CR 2032 battery:
STEP 1:
With the (+) side facing up, slip the battery under the plastic tab (A) at
an angle.
STEP 2:
Push the part of the battery that is sticking out into the holder (on B
side) until it locks in.
To remove your CR 2032 battery:
STEP 1:
Push the plastic tab (B) away from the holder.
STEP 2:
Grab the battery by the sides sticking out of the holder and pull it out.
1
Sensor circuit
2
Battery holder
3
Vacuum power switch
4
CR 2032 3V battery
5
External LED point
6
Integrated warning LED
7
Probe wire harness