background image

  

 

 

 

 

 

 

 

 

 

 

INSTRUCTIONS FOR

 

 

 

 

0. 

GENERAL SAFETY INFORMATION, WARNINGS & CAUTIONS 

1. 

INSTALLATION 

 

 

2.  

THE USER 

3. 

SERVICING 

4. 

DISPOSAL 

 

 

AQUABREAK AB5 BREAKTANK & PUMPSET 

FOR BACKFLOW PROTECTION TO FLUID CATEGORY 5 

 
 

 

 

 

 

 

ISSUE 3   18/07/2017 

 
 
 

Head Office: AGM House, London Rd, Copford, Colchester, Essex CO6 1GT UK 

Tel: 01206 215121 Email: aftersales@agm‐plc.co.uk  

 

Manchester Office : Unit 10, Wheel Forge Way, Ashburton Road West, Manchester. M17 1EH 

Tel: 0161 226 4727  Email: aftersales@agm‐plc.co.uk 

Содержание AquaBreak AB5

Страница 1: ...BREAKTANK PUMPSET FOR BACKFLOW PROTECTION TO FLUID CATEGORY 5 ISSUE 3 18 07 2017 Head Office AGM House London Rd Copford Colchester Essex CO6 1GT UK Tel 01206 215121 Email aftersales agm plc co uk Man...

Страница 2: ...NANCE 6 1 INSTALLATION INSTRUCTIONS 7 1 1 ADDITIONAL WARNINGS 7 1 2 ADDITIONAL CAUTIONS 7 1 3 PROCEDURE 7 1 3 1 OFF LOADING AT SITE 7 1 3 2 LOCATION 8 1 3 3 FIXING 8 1 3 4 PIPEWORK 9 1 3 5 FLOW THROUG...

Страница 3: ...ions PSSR and the Owner User should be made aware of their responsibility for this see section 3 Servicing Failure to install operate use maintain the equipment as recommended below could cause damage...

Страница 4: ...it will contain under worst case fault conditions E g fully saturated pressure vessel with no air charge break tank full to overflowing etc Failure to observe this could cause serious mechanical dama...

Страница 5: ...accumulators 0 2 15 It is the installers responsibility to ensure subsequent pipework etc can accept the pressures generated by the equipment pumpset and to install an overpressure safety device into...

Страница 6: ...nning causing pump seal damage and water leakage 0 3 8 Do no attempt to start pumps without liquid in volutes pumps must be fully primed see 1 2 2 mechanical seals must have a film of liquid between f...

Страница 7: ...pplied as loose item is installed in the breaktank overflow warning pipe see fig 1 3 1 2 4 Mains water pressure to unit should be between 1 0 and 3 0Bar Ensure a pressure reducing valve set at a maxim...

Страница 8: ...a minimum distance of 500mm all round There must be sufficient room to fully open panel door lift and withdraw pumps withdraw diaphragms from vessels Any Hydraulic Accumulator supplied should be loca...

Страница 9: ...it an extra non return valve to the discharge as it may interfere with the correct operation of the non return valve already fitted as standard in the pumpset 1 3 4 5 Connect site pipework to mains wa...

Страница 10: ...ure to the correct level see section 2 4 dependent on the application required for the vessel Refer to the Operating parameters at the back of this manual or contact Aquatech Pressmain for advice 1 3...

Страница 11: ...eak Tank Stop Start Filling Solenoid Probes B3 B2 B1 B2 B3 B1 Level Control Relay set to FS filling short delay medium sensitivity 75k range 5k 150k Solenoid Valve n c min com max SV1 LR1 A1 A1 14 14...

Страница 12: ...authorised AquaTech Pressmain agent This Assurance does not apply to those items not supplied by us or to defects arising from parts not made or approved by AquaTech Pressmain The individual manufactu...

Страница 13: ...ss of all mechanical and electrical connections to ensure they have not loosened during transit 2 2 5 with the pumpset switched off IS1 and the motor circuit breaker switched off CB1 close the dischar...

Страница 14: ...all or floor mounted 2 3 3 1 For normal operation all pumpset inlet and discharge valves should be left open all hydraulic accumulator expansion vessel isolating valves should be left open and drain c...

Страница 15: ...onds and switch power on again to reset control relay No water pump does run Pump air locked Vent prime pump to remove all air Check pump suction strainer inlet filter Reduced intermittent flow Pump p...

Страница 16: ...any build up of debris Fig 2 1 Pump inlet filter suction strainer Mains water inlet strainer The mains water inlet strainer should be regularly checked to remove any build up of debris Fig 2 2 Mains w...

Страница 17: ...s Its specialist fields are Pressure booster equipment and sealed systems for heating and chilled water distribution systems Regular servicing of any plant for essential services is vital because wear...

Страница 18: ...ter Essex CO6 1GT UK Telephone 01206 215121 OPERATING PARAMETERS SERIAL No MODEL AB5 THE SERIAL MODEL NUMBERS MUST BE QUOTED WHEN REQUESTING ASSISTANCE ELECTRICAL DATA Supply 230 volts 1 Ph 50 Hz Full...

Отзывы: