background image

AQUACLAVE Manual Flushing Membrane System

Installation diagram

07

AQUALIFE

MEMBRANE

‘T’ connector

RO membrane:

Install tundish before drain saddle above trap:

Содержание AquaClave P5

Страница 1: ...t 15 Memo USER S MANUAL Aqualife Products Australia Pty Ltd Steam Sterilisor Water System Thank you very much for selecting AQUALIFE In order to bring the best use of your system please read the user s manual carefully before installation and follow the regulations Attention This is a scientific instrument Please ensure that only Aqualife approved replacement components are used Inferior prefiltra...

Страница 2: ... Drinking water solutions are also available from Aqualife Products Australia Pty Ltd IMPORTANT The system has been engineered to operate within a controlled environment Where high water pressure risks exist above 860 Kpa 125 psi a 600 Kpa pressure limiting valve must be installed to avoid nulliying the warranty Australian Plumbing Industry regulations require the installation of a dualcheck valve...

Страница 3: ... The total dissolved solids TDS test meter should be used on every ocasion when drawing water for use Specifications Production 50LPD 240Volt 50 60Hz with a transformer Safety approval TUV EN60950 CE MARK The system has been designed to comply with Australian electrical standards Special technical designs Patented No 068018 flush membrane 100 factory tested and sterilized ready for installation Op...

Страница 4: ...on system the goal is not to dilute the salt solution but to separate the pure water from the dissolved salts and other contaminants When the natural osmotic flow is reversed water from the salt solution is forced to pass through the membrane in the opposite direction by application of pressure thus the term REVERSE OSMOSIS Through this process we are able to produce pure water by screening out th...

Страница 5: ...AQUACLAVE Manual Flushing Membrane System Components selected filters 03 Components 11 litres water storage tank Filter Housing wrench Delivery valve Water supply Tee connector Waste Drain saddle ...

Страница 6: ...h high rejection TFC membrane is manufactured in the USA The membrane removes approximately 99 99 of all dissolved minerals and salts present in the feed water supply Production and performance will be influenced by the chemical analysis of the water supply 3 Years Stage 4 Post Carbon Filter Organic Terminator NSF approved This post membrane carbon filter is designed to remove organic residue It r...

Страница 7: ...AQUACLAVE Manual Flushing Membrane System 05 The parts of AquaClave RO P5 5th To faucet 5th Stage to tank ...

Страница 8: ...connection diagram CONNECTING THE COLOR TUBING A Connect the WHITE tubing to the water supply Tee connector B Connect the BLUE tubing to the sink top faucet C Connect the BLACK tubing to the waste drain saddle D Connect the RED tubing to the storage tank ...

Страница 9: ...AQUACLAVE Manual Flushing Membrane System Installation diagram 07 AQUALIFE MEMBRANE T connector RO membrane Install tundish before drain saddle above trap ...

Страница 10: ...AQUACLAVE Manual Flushing Membrane System 08 Change filters 5 Litres Turn Open housing clockwise with the wrench flush ...

Страница 11: ...AQUACLAVE Manual Flushing Membrane System 09 Change membrane Turn using pliers Loosen Loosen the Jaco fitting anticlockwise Jaco ...

Страница 12: ...AQUACLAVE Manual Flushing Membrane System Operation regulation 10 Turn ...

Страница 13: ... FOR LEAKS E After initial flushing open the shut off valve on the tank and close the sink top faucet F Tank will now be full of water usually 5 to 6 hours Open the sink top faucet and drain all water until the storage tank is empty and there is only a small flow from the sink top faucet DO NOT USE FIRST TANK OF WATER G Close the sink top faucet The system is now ready for use H Change filters reg...

Страница 14: ...hing function We suggest you apply the manual flushing function when A This is the first time you start to use the AquaClave system B When it is time to change filters Applying the manual flushing function regularly once a week is also recommended Caution Keep the system running when manual flushing function is on Have the manual flushing function on for 30 seconds Do remember to turn the manual f...

Страница 15: ...f R O water to fall to half of that at 23 C The maximum water temperature recommended is 27 C 3 Total Dissolved Solids TDS The higher the amount of dissolved contaminants in the water the lower the quantity of water produced A high level of TOTAL DISSOLVED SOLIDS can be overcome with additional water pressure 4 Membrane Different membranes have different characteristics Some produce more water tha...

Страница 16: ...AQUACLAVE Manual Flushing Membrane System Maintenance checking list 14 ...

Страница 17: ...AQUACLAVE Manual Flushing Membrane System Memo 15 AquaClave RO P5 ...

Отзывы: