background image

 

 

 

Fehler! Unbekanntes Schalterargument.

 

 

DUNOS 

/

 

DUNOS 

RW

 Operating Manual

 

AquaDuna GmbH & Co KG / Ferdinand-von-Steinbeis-Ring 31 / 75447 Sternenfels / Germany 

Telephone: +49 (0)7045 204980

www.aquaduna.com

Subject to technical modifications. 

© Copyright by AquaDuna GmbH & Co. KG (2019) All rights reserved. Contact: www.aquaduna.com 

 

The rotation cleaners are deliverable in the standard versions of DR15, DR32, DR60 
and DR90, as well as DRW27 and DRW50. The form and arrangement of the slotted 
nozzles are variable, the range of types is described as follows. 

 

3.5. Measurements DUNOS R 

 

DUNOS 

R15 

R32 

R60 

R90 

Installation diameter (min.) 

DN 20 

DN 40 

DN 65 

DN 100 

Media connection (thread) 

IG 1/8” 

IG 3/8” 

IG 3/4” / 1” 

IG 2” 

Media connection (splint) 

Ø10 

Ø13 / Ø18 

Ø25.4 / Ø29  Ø41 / Ø52 

Working pressure 

1-8 bar 

1-8 bar 

1-8 bar 

1-8 bar 

Flow rate 

up 

to 

0.5 

m³/h 

up to 4 m³/h  up to 10 m³/h  up to 16 m³/h 

Cleaning radius 

up to 0.75 m  up to 2 m 

up to 2.5 m 

up to 3.5 m 

 

 

3.6. Structure of DUNOS RW    

 

 

 

 

 

 

 

3.7. Measurements DUNOS RW 

DUNOS 

RW27 

RW50 

Installation diameter (min.) 

DN 32 

DN 65 

Media connection (thread) 

IG 1/4” 

IG 3/4” / 1” 

Media connection (splint) 

Ø13 

Ø28 / Ø33.7 

Working pressure 

1-8 bar 

1-8 bar 

Flow rate 

up to 2.5 m³/h 

up to 6 m³/h 

Cleaning radius 

Up to 1.5 m 

up to 2.5 m 

 

Connection 

 

Housing 

 

Slotted  noz-
zle 

 

 

Spanner 
flat 

 

Fastening 
thread 

 
 
 

 

Splint 

 

Locking 
washer 

 
 
 

 

Содержание DUNOS R

Страница 1: ...Assembly Manual DUNOS R DUNOS RW...

Страница 2: ...ls used 4 1 3 Limitation of liability 5 1 4 Copyright 5 1 5 Warranty 5 2 SAFETY 6 2 1 Proper use 6 2 2 Operating conditions 6 2 3 Staff qualifications 7 2 4 Duties of the operator 7 3 TECHNICAL DATA 8...

Страница 3: ...ject to technical modifications Copyright by AquaDuna GmbH Co KG 2019 All rights reserved Contact www aquaduna com 7 INTEGRATION AND ACTIVATION 13 7 1 Integration into a cleaning facility 13 7 2 Activ...

Страница 4: ...ation and maintenance of the appliance The basis of working in safety is the observance of all safety notices provided The manual is an essential part of the product and must be kept freely available...

Страница 5: ...by the operator which have not been discussed with and authorised by the manufacturer Furthermore the general terms and conditions also apply 1 4 Copyright Copyright applies to this manual Copyright...

Страница 6: ...proper use of the rotation cleaner the observance of the fol lowing conditions is essential with non observance carrying the threat of severe injury The rotation cleaners may only be operated in close...

Страница 7: ...handling rotating and spraying devices must have been instructed on the hazards connected with these appliances Persons who are not registered as operating staff should not linger within the operatin...

Страница 8: ...t wear free during operation The cascades emerging from the slotted nozzles extensively strike the wall of the container The thereby emerging washing down forces remove deposits from the container wal...

Страница 9: ...urements DUNOS R DUNOS R15 R32 R60 R90 Installation diameter min DN 20 DN 40 DN 65 DN 100 Media connection thread IG 1 8 IG 3 8 IG 3 4 1 IG 2 Media connection splint 10 13 18 25 4 29 41 52 Working pre...

Страница 10: ...arrangement of the slotted nozzles the following spraying angles may be achieved 360 270 upper 180 lower 270 upper 180 upper At the customer s request variations to spraying angles may be made 3 9 Spe...

Страница 11: ...4 Installation and commissioning 4 1 Mounting After unpacking the rotation cleaner the cleaner should then be checked over for outer damage If no support tube lance is supplied fully assembled the cl...

Страница 12: ...ota tion cleaner is ventilated For hand guided fittings these are not to be opened abruptly in order to avoid pres sure shocks 5 Operation For operation in automatically cleaning facilities operators...

Страница 13: ...of the facility are familiar with the facility s design It is vital that training in emergency shutdown be given and the necessary elements for emer gency shutdown be known The training of those entru...

Страница 14: ...oducts undergo a final functional test 100 check We thereby ensure that only reliable products are allowed to leave our premises 11 Disposal All materials stainless steels and PEEK used in production...

Отзывы: