Aqua Flo AQUV-8R1 Скачать руководство пользователя страница 8

8

Sediment

Pre-Filter

Drain Port

(Recommended)

Water Sampling 

Port

TIP: Rotate dome while pushing in

SIDE VIEW

Leave min 36”

clearance on top

Ballast

WATER FLOW

BYPASS VALVE

W

A

L

L

12”

Quartz Dome

Quartz Dome

Gland Nut

1”

Dome O-Ring

Fig.4

Quartz dome is past gland 

nut O-ring and is touching the 

inside top end of the gland 

nut. Caution: Do not push 

hard as it can break the quartz 

dome.

Quartz dome is NOT past 

gland nut O-ring and is NOT 

TOUCHING the inside top end 

of the gland nut.

GL

AND NUT

Fig.5

CORRECT

WRONG

Quartz 

Dome STOP 

position

Fig.6A

Fig.6B

Installing the AQUV Rack System

NOTE

Do not use pipe dope or tape on these top 

threads before attaching gland nut.

1.

  There are two mounting holes on the mounting bracket.  

  Both of them should be mounted directly on to a  

 

  wall stud with appropriate screws to carry the weight of  

  the unit.  Included mounting hardware only works for    

  studs, they are lag bolts and a hole will need to be drilled  

  to put them in without cracking the stud. 

2.

  Install new plumbing using (

Fig 2) 

as reference of how   

  the final installation should look.

3.

  Unscrew the filter sump and remove the sanitary wrap from  

  the filter cartridges. Reinsert the new cartridge into the  

  sump and screw the sump back onto the filter. Hand-tighten  

 only.

4.

  Carefully unpack UV lamp and quartz dome. Two o-rings  

  come with the quartz dome. The thinner o-ring is  

 

  installed in the groove of the gland nut. 

5.

 Gently slide the dome O-ring (thicker) over the top (open end)  

  of the quartz dome to about 1” from the open end (

Fig 4

).

6. 

Gently insert the quartz dome into the gland nut and    

  gently rotate the dome while pushing in until it goes past  

  the nut O-ring and touches the inside top end of the   

  gland nut.

 (Fig 5)

.

7. 

Carefully slide the quartz dome with gland nut attached  

  into the opening at the top of the UV chamber  

   (

Fig 6A & 6B)

 and hand-tighten the gland nut into place.

8. 

Slowly open supply-valve and valves before and after UV  

 system. 

Check for leaks. Do not proceed to next step  

  until leaks are fixed

.

CAUTION!

Do not overtighten the gland nut as it can  

break the quartz dome.

NOTE

Hold lamp and dome by the ends with

soft, dry gloves or cloth. lamp needs to stay  

perfectly clean, any dirt or fingerprints on the 

lamp will reduce the life.

NOTE

Broken quartz domes are not covered  

under warranty.

WARNING!

Do not mount the unit directly on drywall  

without appropriate reinforcement

CAUTION!

DO NOT USE WRENCH TO TIGHTEN SUMP.

Thinner O-Ring

Thicker O-Ring

Содержание AQUV-8R1

Страница 1: ...nstalled in accordance with local plumbing codes 3 Test the water periodically to verify that the system is performing satisfactorily 4 Discard small parts remaining after the installation 5 Failure t...

Страница 2: ......

Страница 3: ...ganisms present in the water supply Simple maintenance continuous disinfection and ultimately safe water AQUA FLO makes it that easy Tested and Certified by CSA Group to CSA Standard B483 1 to NSF ANS...

Страница 4: ...any harmful disinfection by products Fig 1 Lamp contains mercury Hg Dispose or recycle in accordance with applicable laws For information on safe handling procedures and safe disposal and recycling c...

Страница 5: ...the power outlet by holding the plug Never pull the cord To comply with the National Electrical Code and to provide additional protection from the risk of electric shock this system should only be co...

Страница 6: ...he system must be installed in accordance with all local state or provincial regulations The system requires a constant power supply of 110V AC It is strongly recommended to have a dedicated electrica...

Страница 7: ...k If you have other water filters conditioner installed such as softener iron filter etc the UV system should always be installed as the last step of treatment before the water pipes divide into hot a...

Страница 8: ...the new cartridge into the sump and screw the sump back onto the filter Hand tighten only 4 Carefully unpack UV lamp and quartz dome Two o rings come with the quartz dome The thinner o ring is instal...

Страница 9: ...ugh the plastic making it easy to hook up lamp then white plastic part has a little screw to secure it to the gland nut 11 Remove the nut from the ground stud at the top of the unit Next place the gro...

Страница 10: ...s minimal 7 You are ready to use the water now F BALLAST FOR AQUV UV SYSTEMS Aqua Flo AQUV advanced micro processor controlled electronic UV ballast is for use with Aqua Flo AQUV 8 AQUV12 AQUV 20 Syst...

Страница 11: ...rd old cartridge and rinse sump 4 Remove O rings and replace if they have been in use for a year Otherwise wipe them with a soft cloth or paper towel and clean the groove on which the O rings are seat...

Страница 12: ...l re set the lamp change timer to zero and the 3 second beep will confirm that the re set was successful Winterizing Your System To winterize the system unplug the unit first Drain the pre filter by r...

Страница 13: ...nut 2 4 430335 SS UV Chamber for AQUV 8 1 5 Gland Nut 1 6 89587 Chamber Mounting SS Nut 1 7 36003037 Quartz Dome for AQUV 8 1 8 80127302 Dome O Ring Thicker 1 9 80127301 Gland Nut O Ring Thinner insi...

Страница 14: ......

Страница 15: ......

Страница 16: ...including any warranty of merchantability or fitness for a particular purpose and excludes all other express or implied warranties to the extent permitted by law For clarity where exclusion is not pe...

Отзывы: