Quick Installation Guide

1

QS1-EU Microinverter Quick Installation Guide

The sketch of QS1 support system.

All the PV modules are placed into two lines. Then put a QS1 in the middle of the two lines and make
sure it is easy to connect with four PV modules which are next to it, as well all the cables.

Step 1.

Verify the grid voltage to match with microinverter rating

Step 2.

The AC bus distribution

a. The AC bus is arranged at the proper position of the microinverter.
b. One end of the AC bus access junction box into power grid.
c.

Wire the conductors of the AC bus

: L - BROWN; N - BLUE.

NOTE: Wiring colour code can be different according local regulation, check all the wires of the

installation before connecting to the AC bus to be sure they match.Wrong cabling can damage

irreparably the microinverters, such an issue is not covered by the warranty.

Step 3.

Attach the APsystems Microinverters to the racking

NOTE: Do not place the microinverters (including DC and AC connectors) where exposed to the

sun, rain or snow, even gap between modules. Allow a minimum of 3/4’’(1.5cm.) between the roof

and the bottom of the microinverter to allow proper air flow.The racking of install microinverter

must be reliably grounding.

d. Mark the location of the microinverter on the rack, with respect to the PV module

junction box or any other obstructions.

e. Mount one microinverter at each of these locations using hardware recommended

by your module racking vendor.when install microinverter, grounding washer

Must be facing the racking.

Step 4.

Ground the system.

Step 5.

Connect the APsystems Microinverter to AC bus cable

Push the microinverter AC connector to the trunk cable connector. Listen for the "Click".

Please scan the QR code to get

mobile app and more support

to help the installation.

Click

Power grid

Best Practice: Use the Bus

Cable Unlock Tool of AC

Bus to split the connectors.

grounding washer