•
Connect the cooling system pipe to the
pump, the cross member that goes to
the thermostatic valve and secure both
of them using the metal clamps.
•
Insert the two fixing screws of the radi-
ators support bracket and tighten them
to the specified torque.
•
Secure the demand sensor wiring har-
ness to the expansion tank breather
pipe using a new clamp.
•
Connect the breather pipe to the de-
mand sensor wiring harness using a
cable gland and then place the pipe on
the cable gland, connected to the radi-
ator support bracket.
Engine from vehicle
RSV4 1100 Factory
ENG VE - 208
Содержание RSV4 1100 Factory 2021
Страница 1: ...MANUALE STAZIONE DI SERVIZIO 2Q000479 RSV4 1100 Factory ...
Страница 6: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Страница 12: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 53: ...INDEX OF TOPICS SPECIAL TOOLS S TOOLS ...
Страница 61: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 105: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 184: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 213: ...INDEX OF TOPICS ENGINE ENG ...
Страница 330: ...INDEX OF TOPICS POWER SUPPLY P SUPP ...
Страница 334: ... Ease out the pump taking particular care not to damage the pump Injection Power supply RSV4 1100 Factory P SUPP 334 ...
Страница 341: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 383: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 428: ...Chassis RSV4 1100 Factory CHAS 428 ...
Страница 429: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 452: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Страница 464: ...INDEX OF TOPICS BODYWORK BODYW ...