Installation Manual for EHW Tanks: MAN_INST_TANK_SRT(AA)|6

 

CHAPTER 3:

 

SITE INSPECTION 

3.1 STORAGE TANK LOCATION 

 

The storage tanks are able to be installed indoors or 
outdoors.  

 

The  storage  tanks  are  to  be  installed  at  ground  or 
floor  level  and  must  stand  vertically  upright  as  the 
manufacturer has intended.  

 

The  storage  tank  should  be  located  as  close  as 
possible to the most frequent draw off points in the 
building  such  as  the  bathroom  or  kitchen.  If  the 
storage  tank  is  located  a  long  way  from  hot  water 
draw points, a hot water circulation loop on a timer 
may be considered to reduce the time-lag for water 
to heat up and resultant water wastage. 

 

The tank should not obstruct any windows, doors or 
exits  and  should  cause  minimal  intrusion  to  the 
existing site. Clearances must be allowed for to make 
servicing  and  maintenance  convenient  without  the 
need  for  ladder  or  scaffold.  For  servicing,  the PTRV 
must also be easily accessible.  

 

For glass-lined tanks, consider the positioning of the 
tank  to  allow  room  for  anode  removal  and 
replacement maintenance. 

 

The  storage  tank  must  be  installed  in  a  properly 
drained safe tray where leakage may otherwise cause 
damage. The installation of the storage tank and safe 
tray  must  comply  with  AS/NZS  3500.4  and  all  local 
codes  and  regulatory  authority  requirements  with 
regards to its construction, installation and draining. 
Tanks installed outside must be installed on a suitable 
concrete slab.  

 

The tank label must be clearly visible.  

3.2 TRANSPORTATION AND UNPACKING 

3.2.1 TRANSPORTATION OF COMPONENTS 

 

When transporting boxes, note the orientation of the 
"THIS WAY UP" arrows. 

 

Ensure all boxes are strapped and secured to prevent 
movement during transit. 

 

All tanks must be transported upright. Stacking is not 
recommended for any tanks. 

 

Products  should  always  be  handled  with  care. 
Damage  incurred  during  the  transportation  is  not 
covered under product warranty. 

3.2.2 UNPACKING OF COMPONENTS 

 

When  unpacking,  take  care  to  ensure  that  the 
components are not damaged in the process. 

 

Avoid using sharp blades or knives as this can scratch 
the surfaces of the products particularly the tanks. 

 

Содержание AP250GLE

Страница 1: ...Issue Date 01 06 16 Review Date 01 06 16 H0024 028626 A Installation Manual for EHW Tanks MAN_INST_TANK_SRT AA 1 Apricus Solar Hot Water Installation Manual For Electric Hot Water Tanks Solar Ready...

Страница 2: ..._SRT AA 2 CONTENTS CHAPTER 1 INTRODUCTION 3 CHAPTER 2 WARNINGS AND PRECAUTIONS 4 CHAPTER 3 SITE INSPECTION 6 CHAPTER 4 COMPONENT INSPECTION 7 CHAPTER 5 SYSTEM PLUMBING 8 CHAPTER 6 COMMISSIONING 11 CHA...

Страница 3: ...d Tube functions to harness the solar energy by capturing and retaining the heat due to the presence of the vacuum Flow Line The plumbing line running from tank solar flow port to the inlet of the col...

Страница 4: ...ROL Where the mains supply pressure can exceed or fluctuate beyond the pressure of 500kPa a pressure limiting valve must be fitted to the cold mains line The device is installed after the duo valve is...

Страница 5: ...ery important that the auxiliary boosting system remains on It will only activate if the temperature falls below the temperatures outlined 2 5 EHW TANK 2 5 1 HYDROGEN BUILD UP Glass lined vitreous ena...

Страница 6: ...For glass lined tanks consider the positioning of the tank to allow room for anode removal and replacement maintenance The storage tank must be installed in a properly drained safe tray where leakage...

Страница 7: ...an electric element Ensure the tank has two brass plugs 4 2 NECESSARY COMPONENTS Ensure that the following components have been sourced for the installation These are not provided as a standard with t...

Страница 8: ...ATERIAL AND PIPE SIZE For domestic installations the recommended pipe is copper and the size is Two factors affect the choice of pipe sizing the flow rate and pressure drop These two factors are close...

Страница 9: ...ECV Pressure Reducing Valve Four Way Cross Figure 2 Mains Line Valves The set of mains line valves can be purchased as a kit from Apricus and provides the above components with insulating jackets to...

Страница 10: ...extracted to be supplied to the household 5 3 1 5 SENSOR PORTS When solar DHW system is set up the sensors must be coated with heat transfer paste and inserted through the cable gland into the approp...

Страница 11: ...er all the plumbing connections have been made EHW tank needs to be filled with water and purged of air To fill the system 1 Open the cold mains line and fill up the tank and open the hot water outlet...

Страница 12: ...he electrical element will be required to be directly connected to a 240V AC 50Hz mains power supply Flexible conduit is required to enclose any exposed electrical cables to the storage unit 7 2 2 THE...

Страница 13: ...us EHW tank ensure that each of the following processes is carried out prior to leaving the site 8 1 CHECKLIST PRIOR TO LEAVING INSTALLATION SITE EHW tank check Check all connections for leaks and tha...

Страница 14: ...sue Date 01 06 16 Review Date 01 06 16 H0024 028626 A Installation Manual for EHW Tanks MAN_INST_TANK_SRT AA 14 CHAPTER 9 APPENDIX 7 1 3 6 5 4 2 Figure 4 Typical Electric boosted solar hot water syste...

Страница 15: ...or adverse water conditions including excessive water pressure or temperature neglect of any kind or otherwise as a result of any use of the Unit contrary to the product manual or other instructions p...

Страница 16: ...annot be excluded under the Australian Consumer Law You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage You are als...

Отзывы: