Apricus AP250GLE Скачать руководство пользователя страница 3

                          Issue Date: 01.06.16 

 

     

   Review Date: 01.06.16  

H0024 028626 A  

Installation Manual for EHW Tanks: MAN_INST_TANK_SRT(AA)|3

 

CHAPTER 1:

 

INTRODUCTION 

1.1

 

TERMINOLOGY 

 

Boost: The process where a heating component (such 
as  an  electric  element)  is  used  to  provide  auxiliary 
heating/ 

 

Collector:  The  Apricus  solar  collector  includes  the 
manifold  with  heat  pipes  and  evacuated  tubes 
inserted. 

 

Expansion Control Valve (ECV): Installed on the cold 
mains line to relieve excess pressure. 

 

Evacuated  Tube:  functions  to  harness  the  solar 
energy by capturing and retaining the heat due to the 
presence of the vacuum.  

 

Flow Line: The plumbing line running from tank solar 
flow  port  to  the  inlet  of  the  collector.  This  line 
incorporates the circulation pump. 

 

Manifold: Refers to the solar collector enclosure that 
contains the header pipes. 

 

Pressure  Temperature  Relief  Valve  (PTRV):  installed 
on the hot water storage tank to relieve pressure, and 
excessive temperatures. 

 

Return Line: The plumbing line running from the solar 
collector to the solar return port on the tank. 

1.2

 

SCOPE 

This  manual  has  been  designed  to  provide  installation 
instructions for the installer or plumber.  

 

Содержание AP250GLE

Страница 1: ...Issue Date 01 06 16 Review Date 01 06 16 H0024 028626 A Installation Manual for EHW Tanks MAN_INST_TANK_SRT AA 1 Apricus Solar Hot Water Installation Manual For Electric Hot Water Tanks Solar Ready...

Страница 2: ..._SRT AA 2 CONTENTS CHAPTER 1 INTRODUCTION 3 CHAPTER 2 WARNINGS AND PRECAUTIONS 4 CHAPTER 3 SITE INSPECTION 6 CHAPTER 4 COMPONENT INSPECTION 7 CHAPTER 5 SYSTEM PLUMBING 8 CHAPTER 6 COMMISSIONING 11 CHA...

Страница 3: ...d Tube functions to harness the solar energy by capturing and retaining the heat due to the presence of the vacuum Flow Line The plumbing line running from tank solar flow port to the inlet of the col...

Страница 4: ...ROL Where the mains supply pressure can exceed or fluctuate beyond the pressure of 500kPa a pressure limiting valve must be fitted to the cold mains line The device is installed after the duo valve is...

Страница 5: ...ery important that the auxiliary boosting system remains on It will only activate if the temperature falls below the temperatures outlined 2 5 EHW TANK 2 5 1 HYDROGEN BUILD UP Glass lined vitreous ena...

Страница 6: ...For glass lined tanks consider the positioning of the tank to allow room for anode removal and replacement maintenance The storage tank must be installed in a properly drained safe tray where leakage...

Страница 7: ...an electric element Ensure the tank has two brass plugs 4 2 NECESSARY COMPONENTS Ensure that the following components have been sourced for the installation These are not provided as a standard with t...

Страница 8: ...ATERIAL AND PIPE SIZE For domestic installations the recommended pipe is copper and the size is Two factors affect the choice of pipe sizing the flow rate and pressure drop These two factors are close...

Страница 9: ...ECV Pressure Reducing Valve Four Way Cross Figure 2 Mains Line Valves The set of mains line valves can be purchased as a kit from Apricus and provides the above components with insulating jackets to...

Страница 10: ...extracted to be supplied to the household 5 3 1 5 SENSOR PORTS When solar DHW system is set up the sensors must be coated with heat transfer paste and inserted through the cable gland into the approp...

Страница 11: ...er all the plumbing connections have been made EHW tank needs to be filled with water and purged of air To fill the system 1 Open the cold mains line and fill up the tank and open the hot water outlet...

Страница 12: ...he electrical element will be required to be directly connected to a 240V AC 50Hz mains power supply Flexible conduit is required to enclose any exposed electrical cables to the storage unit 7 2 2 THE...

Страница 13: ...us EHW tank ensure that each of the following processes is carried out prior to leaving the site 8 1 CHECKLIST PRIOR TO LEAVING INSTALLATION SITE EHW tank check Check all connections for leaks and tha...

Страница 14: ...sue Date 01 06 16 Review Date 01 06 16 H0024 028626 A Installation Manual for EHW Tanks MAN_INST_TANK_SRT AA 14 CHAPTER 9 APPENDIX 7 1 3 6 5 4 2 Figure 4 Typical Electric boosted solar hot water syste...

Страница 15: ...or adverse water conditions including excessive water pressure or temperature neglect of any kind or otherwise as a result of any use of the Unit contrary to the product manual or other instructions p...

Страница 16: ...annot be excluded under the Australian Consumer Law You are entitled to a replacement or refund for a major failure and for compensation for any other reasonably foreseeable loss or damage You are als...

Отзывы: