Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
51
Step 11: Connect Cables and Power (Non-Quilt Path)
Tools Needed:
Phillips Screwdriver
Scissors
Parts Required:
Sewing Head CAT-5 Cable (1 foot cable)
Carriage Encoder CAT-5 Cable (3 foot cable)
Power Cord
Zip Ties
Cushion Clamp & Mounting Screw
If you are installing Quilt Path, skip this step and move to the Quilt
Path Manual to complete your setup.
1.
Plug the RIGHT rear handle
into the Right handle jack
(middle outlet).
2.
Plug one end of the 3-foot
CAT-5 cable into the
CARRIAGE ENCODER jack.
3.
Plug the blue LEFT rear
handle cable into the Left
handle jack.
4.
Locate the Sewing Head CAT-5 cable taped to the
machine’s throat. It will connect the head encoder
pictured above to the side of the machine
5.
Plug one end into the encoder jack and the
other end into the Head Encoder jack on the
machine