![APQS Freddie Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/apqs/freddie/freddie_installation-manual_2955518023.webp)
Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
23
Position the Table Top
Step 4: Level the Table
1.
Place an adhesive felt dot on top of the rail directly in line with each
cross tube (image A). Place two more felt dots on each rail equally
spaced between the dots that are in line with the cross tubes (image B).
2.
Carefully open Box 3 and remove the table
top sections.
3.
Place one table top section on the table,
taking care to place the center sections over
one set of bumpers on the center cross tube.
4.
Place the painter’s tape side of the plastic
pantograph cover facing the rear (pantograph)
side of the table.
5.
Make sure the sections meet in the center with
each half supported on the center cross tube
bumpers.
6.
Remove the painter’s tape from the plastic pantograph cover. (Paper patterns will be placed under
the plastic cover when quilting from the pantograph side of the frame.)
A
B