Millie – Millie 30 – Freddie Installation
9-1-2022
APQS.com
22
Step 3: Install the Table Top & Leveling the Table
NOTE: If you are installing Quilt Path computerized system, Hydraulic Lift
or Overhead Lighting, go to those manuals before going forward.
Peel the paper backing off the table top bumpers (O). Press firmly into position as instructed in the
next steps.
1.
Position 6 bumpers on the center
cross tube straddling the cross tube’s
center channel. The table top sections
will meet at the center cross tube.
2.
Stick 3 bumpers on each of the 4
remaining cross tubes. Put them on
one side of the cross tube’s center
channel or the other. Press into place.