![Applent Instruments AT811 Скачать руководство пользователя страница 5](http://html.mh-extra.com/html/applent-instruments/at811/at811_user-manual_2954891005.webp)
5
Unpacking and Inspection
1
Unpacking and Inspection
This chapter provides the following information:
Packing List
Power Supply
Setup Fuse
Operating Environment
Cleaning
How to Remove the Handler
1.1
Packing List
After you receive the instrument, carry out checks during unpacking according to the following
procedure.
1
.
Check that the packing box or shock-absorbing material used to package the instrument has
not been damaged
2
.
Check all the packaged items supplied with the meter have been provided as pert the specified
optioned.
If it is damaged or less accessories, pls contact Applent Sales or Distributors.
1.2
Power Supply
Confirm that the power supplied to the AT811 meets the following requirements
Voltage: 90V-260VAC
Frequency: 47-440Hz
Power: Max10VA
WARNING
:
The ground wire should be earthed to avoid being electric shock.
If you change the power cord, make sure the ground wire earthed.
1.3
Setup Fuse
Figure 1-1 Fuse
Fuse