background image

110-240V

LEVELER
RULER

ADJUSTABLE
WRENCH

TEFLON
TAPE

FLEXIBLE
DRAIN

included

(AC110-240V/300W-400W)

AIR JETTED FREESTANDING BATHTUB 

WITH CHROMA-LIGHTS

Item: 1344319 / 2344319

INSTALL  &  OPERATION MANUAL

V2.2 

MILAN

DON’T WAIT!

REGISTER NOW!

Register your product within 30 days to ensure your bathtub is 

recognized as an official purchase and is eligible for warranty 

coverage.

Mail in the completed registry card (Pg. 2) or register online 

at 

www.ANZZI.com/register

.

Содержание MILAN 1344319

Страница 1: ...LL OPERATION MANUAL V2 2 MILAN DON T WAIT REGISTER NOW Register your product within 30 days to ensure your bathtub is recognized as an official purchase and is eligible for warranty coverage Mail in t...

Страница 2: ...istrationcardbelow Byreturningthisregistration card we confirm the date of purchase for your new product This confirmation will allow us to process any warranty claims Mail the card to 5701 NW 35 Aven...

Страница 3: ...RIGHTS RESERVED 66 9 INCLUDES AERO THERAPEUTIC BUBBLE MASSAGE SYSTEM 4 CHROMA THERAPEUTIC BATHING LIGHTS FEATHER TOUCH LIGHT UP CONTROL PAD BUILT IN OVERFLOW AND POP UP DRAIN Power Supply Control Box...

Страница 4: ...WARNING WHEN USING THIS PRODUCT BASIC PRECAUTIONS SHOULD ALWAYS BE FOLLOWED READ AND FOLLOW ALL INSTRUCTIONS PERTAININGTORISKOFFIRE ELECTRICALSHOCK AND OROTHERINJURIES REPORT DAMAGES RIGHT AWAY REPORT...

Страница 5: ...PAS LAISSER UN ENFANT UTILISER LA CUVE A REMOUSEN L ABSENCED UNADULTE WARNING TOAVOIDINJURY EXERCISECAREWHENENTERINGOREXITINGTHEJETTEDBATHTUB AVERTISSEMENT POUR EVITERLES BLESSURES USERDEPRUDENCEENEN...

Страница 6: ...ATHTUB FROM THE BOX AND PREPARE THE FOLLOWING TOOLS LEVELER RULER ADJUSTABLE WRENCH TEFLON TAPE FLEXIBLE DRAIN included NOTE THE INCLUDED FLEXIBLE DRAIN IS TO BE USED ONLY TO TEST THE BATHTUB BEFORE P...

Страница 7: ...IONS Placethetub on acompletelyflatsurfaceinanareawhereitmaybedrainedaftertesting Closethedrain andfillthetubabouthalfway Allowthewater tostandintubfor30minutesandtheninspectallplumbingandsealsforleak...

Страница 8: ...ESIRED ORIENTATION THEN USE A LEVEL TO ENSURE THE TUB SURFACE IS LEVEL IF NOT LIFT ONE END OF THE BATHTUB AND LOOSEN THE ADJUSTING NUT ON THE TUB FOOT AS SHOWN IN THE FIGURE AFTER ADJUSTING THE LEVELI...

Страница 9: ...THE ELECTRICAL CORD INTO A GFCI PROTECTED 20AMP OUTLET CONNECT THE DRAIN LINE TO THE TUB DRAIN USING TEFLON TAPE NOTE THE INCLUDED FLEXIBLE DRAIN IS TO BE USED ONLY TO THE TEST THE BATHTUB BEFORE PER...

Страница 10: ...ANZZI com SEAL TUB ADD A BEAD OF SILICONE AROUND THE BASE OF THE BATHTUB AND ALLOW 24 HOURS TO PASS BEFORE USE TO ENSURE THE SILICONE HAS SET FILL THE BATHTUB FINALLY FILL THE BATHTUB WITH WATER REMEM...

Страница 11: ...y power itself off after 60 minutes Press the Power button If system is locked press and hold the Power button for 2 seconds then press the power button again to turn off the system CHROMA LIGHT Push...

Страница 12: ......

Отзывы: