Antaira Technologies - Industrial Ethernet Switches
LNP-0800G Series - Hardware Manual - v1.0
4 Hardware Installation
4.1 Installation Steps
This section will explain how to install the industrial Ethernet switch:
Caution:
This device is intended for indoor use.
Attention:
Cet appareil est destiné à une utilisation en intérieur.
Caution:
The device is intended to be installed in an industrial control enclosure and panel.
Attention:
L'appareil est destiné à être installé dans une armoire de commande et un panneau industriels.
Installation Steps
1. Unpack the industrial Ethernet switch from the original packing box.
2. Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.
●
If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the
DIN-Rail Mounting
section
for DIN-Rail installation.
●
If it is required to wall mount the industrial Ethernet switch, please refer to the
Wall Mounting
section for wall
mounting installation.
3. To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the
Mounting Installation
section.
4. Power on the industrial Ethernet switch and then the power LED light will turn on.
●
For help on how to wire power, please refer to the
Wiring the Power Inputs
section.
●
Please refer to the
LED Indicators
section for LED light indications.
5. Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.
6. Insert one side of the RJ45 cable into the switch’s Ethernet port and on the other side into the networking device’s
Ethernet port, e.g. switch PC or server.
●
The Ethernet port’s (RJ45) LED on the industrial Ethernet switch will turn on when the cable is connected to
the networking device.
●
Please refer to the
LED Indicators
section for LED light indication.
7. When all connections are set and the LED lights all show normal, the installation is complete.
13