
Antaira Technologies - Industrial Ethernet Switches
LMP-1002G-SFP Series Hardware Manual V1.2
11
Caution:
The wire gauge for the terminal block should range between 12 ~ 24AWG
If only using one power source, jumper Pin 1 to Pin 5 and Pin 2 to Pin 6 to
eliminate power fault alarm.
2.10 Grounding Note
Grounding and wire routing help limit the effects of noise due to electromagnetic interference (EMI).
Run the ground connection from the ground screw to the grounding surface prior to connecting
devices. The grounding screw symbol is shown blow in Figure 2.15.
Figure 2.15 - Grounding screw
Caution: Using a shielded cable achieves better electromagnetic compatibility.
3. Mounting Installation
3.6 DIN-Rail Mounting
The DIN-Rail is pre-installed on the industrial
Ethernet switch from the factory. If the DIN-Rail
is not on the industrial Ethernet switch, please
see Figure 3.1 to learn how to install the DIN-
Rail on the switch.
Follow the steps below to learn how to hang the industrial Ethernet switch.
1. Use the screws to install the DIN-Rail bracket on the rear side of the industrial Ethernet switch.
Figure 3.1
The Rear Side of the Switch and DIN-Rail Bracket