Antaira Technologies - Industrial Wireless Access Points
ARY-7235-AC-PD - Hardware Manual - v1.0
4 Hardware Installation
4.1 Installation Steps
This section will explain how to install the industrial wireless access point:
Installation Steps
1. Unpack the industrial wireless access point from the original packing box.
2. To hang the industrial wireless access point on a pole, please refer to the Mounting Installation
section.
3. To power the industrial wireless access point, you will need an accessory that can provide PoE
via an RJ45 cable.
4. Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection/power.
5. Insert one side of the RJ45 cable into the wireless access point’s Ethernet port (LAN) and on the
other side into the networking device’s Ethernet port (e.g.; switch, PC, or server).
6. When all connections are set, the installation is complete.
4.2 Maintenance and Service
●
If the device requires servicing of any kind, the user is required to disconnect and remove it from
its mounting. The initial installation should be done in a way that makes this as convenient as
possible.
●
Voltage / Power lines should be properly insulated as well as other cables. Be careful when
handling them so as to not trip over.
●
Do not under any circumstance insert foreign objects of any kind into the heat dissipation
holes located in the different faces of the device. This may not only harm the internal layout,
but might cause harm to users as well.
●
Do not under any circumstance open the device for any reason. Please contact your dealer
for any repair needed or follow the instructions within the manual.
●
Clean the device with dry soft cloth.
8