
NOTE: The Vpp measurement can be displayed in dBdsx format by pressing
the Vpp/dBdsx soft key.
Step 5.
Press the
Start/Stop Measure
soft key to start or stop the peak to peak voltage
measurement.
BERT Measurement Setup
Step1.
Press the
MODE
key, select
E1 Tester
, and press
ENTER
.
Step2.
Select the
Setup
soft key.
Step3.
Press the
Framing Mode
soft key and choose
Auto
,
PCM30
,
PCM30CRC
,
PCM31
or
PCM31CRC
framing type. Press
Back
to return to the previous menu.
NOTE: The Cell Master will attempt auto-framing in two situations only:
1. When the unit is initially set for auto-detect, and
2. When a new measurement is started and loss of frame or pattern sync is de-
tected. The Cell Master will not attempt to auto detect in mid-measurement.
Step4.
Press the
Receive Input
soft key and select
Bridged
mode. Press
Back
to return
to the previous menu.
Step5.
Press the
Line Coding
soft key and select
HDB3
or
AMI
coding. Press
Back
to re-
turn to the previous menu.
Step6.
Select the
More
soft key to access more menu selections.
Step7.
Press the
Clock Source
soft key and select
External
clock. Press
Back
to return
to the previous menu.
Step8.
Press the
Impedance
soft key and choose
75
W
or
120
W
. Press
Back
to return to
the previous menu.
10-4
Chapter 10 E1 Measurements
Содержание Cell Master MT8212B
Страница 3: ......
Страница 5: ......
Страница 222: ...12 4 Chapter 12 GPS Feature Figure 12 3 Saved GPS Location Information...
Страница 231: ...Chapter 13 CDMA Measurement 13 9 Figure 13 5 CDMA Display with Markers...
Страница 255: ...Chapter 18 EVDO Mode 18 5...