![Anritsu BTS Master MT8221B Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/anritsu/bts-master-mt8221b/bts-master-mt8221b_user-manual_2945251040.webp)
2-11 Test Panel Connectors
Instrument Overview
2-16
PN: 10580-00207 Rev. E
BTS Master UG
External Power
The external power connector is used to power the unit and for battery charging. Input is
12 VDC to 15 VDC at up to 5.0 A. A green flashing indicator light near the power switch
shows that the instrument battery is being charged by the external charging unit. The
indicator is steadily illuminated when the battery is fully charged.
LAN Connection
The RJ-45 connector is used to connect the BTS Master to a local area network. Integrated
into this connector are two LEDs. The amber LED shows the presence of a 10 Mbit/s LAN
connection when on, and a 100 Mbit/s LAN connection when off. The green LED flashes to
show that LAN traffic is present. For additional information about the LAN connection,
Ethernet connection, and DHCP, refer to
Appendix C, “Ethernet Configuration”
.
Figure 2-13.
Test Panel Connectors, Including T1 and T3
Warning
When using the AC-DC Adapter, always use a three-wire power cable that is
connected to a three-wire power line outlet. If power is supplied without grounding
the equipment in this manner, then the user is at risk of receiving a severe or fatal
electric shock.
Headset
Jack
USB
Mini-B
Type-A
USB
LAN
External
Power
GPS
Antenna
Ext
Trigger In
SPA RF In
—
VNA Port 2
Ext
RF In
10 MHz Ref Out
RF Output
IF Out
T1, T3
Receive
Transmit
Содержание BTS Master MT8221B
Страница 1: ...BTS Master User Guide MT8221B and MT8222B The High Performance Handheld Base Station Analyzer ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 24: ...1 12 Secure Environment Workplace General Information 1 10 PN 10580 00207 Rev E BTS Master UG ...
Страница 46: ...2 13 Firmware Overview Instrument Overview 2 22 PN 10580 00207 Rev E BTS Master UG ...
Страница 54: ...3 8 PN 10580 00207 Rev E BTS Master UG ...
Страница 88: ...7 8 PN 10580 00207 Rev E BTS Master UG ...
Страница 94: ...8 5 Updating Instrument Firmware Master Software Tools 8 6 PN 10580 00207 Rev E BTS Master UG ...
Страница 95: ...Master Software Tools 8 5 Updating Instrument Firmware BTS Master UG PN 10580 00207 Rev E 8 7 ...
Страница 96: ...8 5 Updating Instrument Firmware Master Software Tools 8 8 PN 10580 00207 Rev E BTS Master UG ...
Страница 97: ...Master Software Tools 8 5 Updating Instrument Firmware BTS Master UG PN 10580 00207 Rev E 8 9 ...
Страница 98: ...8 5 Updating Instrument Firmware Master Software Tools 8 10 PN 10580 00207 Rev E BTS Master UG ...
Страница 114: ...C 8 PN 10580 00207 Rev E BTS Master UG ...
Страница 118: ...Index 4 PN 10580 00207 Rev E BTS Master UG ...
Страница 119: ...Anritsu Company 490 Jarvis Drive Morgan Hill CA 95037 2809 P N 10000 00000 Revision Prelim Printed March 2014 ...
Страница 152: ...2 18 Other Menus GSM GPRS EDGE Signal Analyzer 2 18 PN 10580 00234 Rev V 3GPP MG ...
Страница 196: ...3 18 Other Menus W CDMA HSPA Signal Analyzer 3 44 PN 10580 00234 Rev V 3GPP MG ...
Страница 224: ...4 16 Other Menus TD SCDMA HSPA Signal Analyzer 4 28 PN 10580 00234 Rev V 3GPP MG ...
Страница 272: ...5 19 Other Menus LTE Signal Analyzer 5 48 PN 10580 00234 Rev V 3GPP MG ...
Страница 338: ...7 5 Coverage Mapping Menu LTE and TD LTE Coverage Mapping 7 16 PN 10580 00234 Rev V 3GPP MG ...
Страница 354: ...8 4 W CDMA EMF Menu EMF Option 444 8 16 PN 10580 00234 Rev V 3GPP MG ...
Страница 360: ...Index 4 PN 10580 00234 Rev V 3GPP MG ...
Страница 361: ......