Installation and commissioning
30
Edition 05/2014
PlasmaQuant PQ 9000
6
Installation and commissioning
CAUTION! Prevent any unauthorized interference!
The device may only be assembled, installed and repaired by the service engineers from
Analytik Jena AG or by technical personnel authorized by Analytik Jena AG.
6.1
Supply and control connections
The supply lines are connected during the installation of the PlasmaQuant PQ 9000 by service
engineers from Analytik Jena AG.
The green power switch and the red plasma deactivation switch are located on the left-hand
side of the PlasmaQuant PQ 9000. Also on the left side, under a cover plate, there are the
connections for PC and accessories as well as the media connections for gas and the cooling
water inlet and outlet.
A pair of carrying handles are fastened to the left and right for transport and installation. The
handles are unscrewed and removed after installation. The carrying handles must be stored in a
safe place in case the device has to be transported again or moved within the laboratory.
1
Manual plasma
deactivation switch
2
Power switch
3, 4 Openings for carrying
handles
5
Gas connectors and
connections for water
cooling
6
Power cable
7
Fuses
8
Interfaces
9
Type plate
Figure 9
Overview of connections on the left side of the device