Evaluation Board User Guide
UG-380
Rev. 0 | Page 3 of 24
QUICK START GUIDE
Follow these steps to quickly evaluate the
device:
1.
2.
evaluation board to the PC
3.
Follow the hardware driver installation procedure.
4.
Connect the power supplies to banana connectors (5.5 V).
5.
6.
Connect the spectrum analyzer to SMA connector
VCO_I/O.
7.
Measure the results.
Содержание EVAL-ADF4150EB1Z
Страница 15: ...Evaluation Board User Guide UG 380 Rev 0 Page 15 of 24 10552 024 Figure 24 Evaluation Board Schematic Page 2 ...
Страница 16: ...UG 380 Evaluation Board User Guide Rev 0 Page 16 of 24 10552 025 Figure 25 Evaluation Board Schematic Page 3 ...
Страница 17: ...Evaluation Board User Guide UG 380 Rev 0 Page 17 of 24 10552 026 Figure 26 Evaluation Board Schematic Page 4 ...
Страница 18: ...UG 380 Evaluation Board User Guide Rev 0 Page 18 of 24 10552 027 Figure 27 Layer 1 Component Side ...
Страница 19: ...Evaluation Board User Guide UG 380 Rev 0 Page 19 of 24 10552 028 Figure 28 Layer 2 Ground Plane ...
Страница 20: ...UG 380 Evaluation Board User Guide Rev 0 Page 20 of 24 10552 029 Figure 29 Layer 3 Power Plane ...
Страница 21: ...Evaluation Board User Guide UG 380 Rev 0 Page 21 of 24 10552 030 Figure 30 Layer 4 Solder Side ...