UG-232
Evaluation Board User Guide
Rev. 0 | Page 2 of 32
TABLE OF CONTENTS
Equipment Needed ........................................................................... 1
Software Needed ............................................................................... 1
Documents Needed .......................................................................... 1
General Description ......................................................................... 1
Typical Measurement Setup ............................................................ 1
Revision History ............................................................................... 2
Evaluation Board Hardware ............................................................ 3
Power Supplies .............................................................................. 3
Input Signals...................................................................................3
Output Signals ...............................................................................3
Default Operation and Jumper Selection Settings ....................5
Evaluation Board Software Quick Start Procedures .....................6
Configuring the Board .................................................................6
Using the Software for Testing .....................................................6
Evaluation Board Schematics and Artwork ................................ 11
Ordering Information .................................................................... 25
Bill of Materials ........................................................................... 25
REVISION HISTORY
12/10—Revision 0: Initial Version
Содержание AD6642
Страница 13: ...UG 232 Evaluation Board User Guide Rev 0 Page 12 of 32 09572 021 Figure 21 Board Power Input and Supply...
Страница 18: ...Evaluation Board User Guide UG 232 Rev 0 Page 17 of 32 09572 026 Figure 26 Default Clock Input Circuit...
Страница 19: ...UG 232 Evaluation Board User Guide Rev 0 Page 18 of 32 09572 027 Figure 27 Optional Clock Input Circuit...
Страница 20: ...Evaluation Board User Guide UG 232 Rev 0 Page 19 of 32 09572 028 Figure 28 Optional AD9517 Clock Input Circuit...
Страница 21: ...UG 232 Evaluation Board User Guide Rev 0 Page 20 of 32 09572 029 Figure 29 SPI Configuration Circuit...
Страница 22: ...Evaluation Board User Guide UG 232 Rev 0 Page 21 of 32 09572 030 Figure 30 FIFO Board Connector Circuit...