Overview

The CB-MVPWDS Rough-In Box allows the MVP-WDS to be installed in a solid 
surface (e.g., wall or podium). This Rough-In box includes a removable access 
plate to provide better access to wiring. The CB-MVPWDS is symmetric top-to-
bottom, so the access plate may be installed at the top or the bottom. 

Specifications 

WARNING:

 INSTALLER, LEAVE A GAP BETWEEN THE STUD AND 

ROUGH-IN BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK. 
This gap allows the installation of the drywall/sheetrock after the CB-MVPWDS 
has been mounted onto the beams. The stud notching and Rough-In Box 
installation must be done prior to any wall installation.

Note: 

The most important thing to remember when mounting this Rough-In Box 

is that the mounting tabs must be mounted flush against the outside of the 
sheetrock. This step determines whether or not the mounting stud is notched

 

(cutout-out to fit the Rough-In Box).

Installing the CB-MVPWDS Rough-In Box

The CB-MVPWDS (

FG037-10

) is a metallic Rough-In Box that can be secured to 

a stud in a pre-wall setting. The MVP-WDS can then installed into the Rough-In 
Box. 

Note

: Installation procedures and configurations vary depending on the 

installation environment.

When mounting the Rough-In Box, the MVP-WDS Mounting Tabs must lie flush 
against the outside of the sheetrock.
Refer to SP596502 for detailed installation dimensions (see reverse).

• It is recommended that you cut out the surface slightly smaller than what is 

outlined in the installation drawings so that you can make any necessary 
cutout adjustments.

• The CB-MVPWDS can be installed with the removable access panel 

positioned either on top or bottom. The access panel provides convenient 
access to in-wall wiring and must be re-installed prior to mounting the 
MVP-WDS.

1.

Place the left side of the Rough-In Box on a stud, making sure that five 
Stud Fastening Holes and removable Access Panel are oriented correctly 
(installation dependent). Be sure to leave enough of a gap between the 
stud and Mounting Tabs to accommodate the installation of the drywall or 
sheetrock after the Rough-In Box has been mounted. Ultimately, the 
Mounting Tabs should lie flush against the outside of the sheetrock. 

Note

: Although there are wiring knockouts are on both sides of the Rough-In 

Box, the knockouts on the right side will be used for the MVP-WDS (wall docking 
station) connectors, so always secure the Rough-In Box to the stud using the 
Stud Mounting Holes on the left side of the box.

2.

Using either nails or screws, fasten the Rough-In Box to the stud through 
the five Stud Fastening Holes.

3.

Remove the wiring knockouts from the right side of the Rough-In Box to 
accommodate cabling to the MVP-WDS.

4.

Thread the USB and Power cables through the knockouts on the right of 
the Rough-In Box. It is recommended that you test these connections 
before fully installing the WDS. 

5.

Install the drywall/sheetrock before inserting the MVP-WDS into the 
Rough-In Box.

CB-MVPWDS (FG037-10) Specifications

Dimensions (HWD):

• 8 3/16" x 12" x 3 1/4" 
• 20.7 mm x 30.4 mm x 8.2 mm

Included Accessories

• Five mountings screws (#4-24 X .188, PFH, BLK, 

TYPE B, SELF-TAPPING, SHT MTL) 
(80-0203-01)

Certifications:

• UL 508A