7-21
Cycle and Control Value Programming
Operator Manual
P129394-176
7.5.5 Steam Generator
Flush Cycle
The
FLUSH TIME
function shown on Screen #48 is active only
when
Automatic Utilities Control
has been enabled (see
Section 7.5.3, Utilities Control, on page 7-16
). The
FLUSH
DURATION
set up function is always used when the sterilizer is
equipped with an integral steam generator. Flush
duration
applies if
utilities are being controlled automatically or manually.
1.
Select the
Generator Flush Option
from screen #39. The
control advances to the generator flush and drain scheduling
screen (#48).
2.
At screen #48, select
FLUSH TIME
and schedule the time of day
for the generator flush and drain.
3.
Once the time day for the generator flush sequence has been
scheduled, press
EXIT
to return to screen #48.
ENTER GENERATOR FLUSH TIMES
SELECT "FLUSH TIME" OR
SELECT "FLUSH DURATION " TO SET
FLUSH TIME = 00:00 AM
48
FLUSH TIME
1
2
3
AM
4
5
6
PM
7
8
9
EXIT
<-
0
->
FLUSH DURATION
Figure 7-5. Generator Flush Duration Time Control
Screen
ENTER GENERATOR FLUSH TIMES.
ENTER "FLUSH TIME" OR
SELECT "FLUSH DURATION" TO SET.
FLUSH DURATION = 5:00 M : S
49
FLUSH TIME
FLUSH DURATION
1
2
3
EXIT
4
5
6
7
8
9
<-
0
->
Refer to
Section 7.5.4, Steam Generator Flush
and Drain Set Up, on page 7-20
Use the keypad to enter the duration length for
the FLUSH phase of the cycle.
Содержание C Series
Страница 62: ...6 18 P129394 176 Operator Manual Sterilizer Operation Figure 6 9 Typical Printout of a Liquid Cycle ...
Страница 146: ...10 2 P129394 176 Operator Manual Service Procedures Figure 10 1 Serviceable Components ...
Страница 153: ...10 9 Service Procedures Operator Manual P129394 176 Figure 10 1 Piping Schematic ...