124
ARR 1575
555049
555150
3.6. Individual Operations of Maintenance
3.6.23. Check of articulation joint
• Check the articulation joint once a year for excessive play.
• Lift the machine with a crane for 1-point lifting eye.
• Visually check the clearance of the articulated joint by ap-
plying pressure on the machine alternatively upwards and
downwards.
3.6.24. Checking the damping system
Check the condition of the rubber-metals, the strength of the
bond between metal and rubber.
Replace if damaged.
Check the tightness of screws and nuts.
Drum rubber-metal
Order number:1217092
Содержание ARR 1575 Yanmar
Страница 1: ...Book ID 4 P06557YA Yanmar EN Operating manual ARR 1575...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 14: ...8 ARR 1575...
Страница 15: ...9 ARR 1575 SPECIFICATION MANUAL 1 SPECIFICATION MANUAL ARR 1575 Yanmar Tier 4 Final...
Страница 21: ...15 ARR 1575 OPERATING MANUAL Notes...
Страница 22: ...16 ARR 1575 Notes...
Страница 23: ...17 ARR 1575 OPERATION MANUAL 2 OPERATION MANUAL ARR 1575 Yanmar Tier 4 Final...
Страница 24: ...18 ARR 1575...
Страница 30: ...24 ARR 1575 9 555087B 16 10 11 1 18 5 15 1 2 1 Major Safety Precautions...
Страница 59: ...53 ARR 1575 40 555125 555129 40 40 555122 OPERATION MANUAL...
Страница 90: ...84 ARR 1575 Notes...
Страница 91: ...85 ARR 1575 OPERATION MANUAL Notes...
Страница 92: ...86 ARR 1575...
Страница 93: ...87 ARR 1575 MAINTENANCE MANUAL 3 MAINTENANCE MANUAL ARR 1575 Yanmar Tier 4 Final...
Страница 94: ...88 ARR 1575...
Страница 142: ...136 ARR 1575 3 8 Annexes Notes...
Страница 143: ...137 ARR 1575 MAINTENANCE MANUAL Notes...
Страница 144: ...138 ARR 1575 Notes...
Страница 145: ......
Страница 146: ...Ammann Unternehmungen Eisenbahnstrasse 25 CH 4901 Langenthal Phone 41 62 916 61 61 www ammann group com...