
User Manual for AML Oceanographic’s MVP
X
4
Shipping & Receiving
Receiving an Instrument
When receiving an instrument, perform the following steps to ensure the instrument will be ready
for deployment when required:
Inspect the shipping container, looking for signs of damage. Damage to the shipping
container could indicate damage to the instrument inside.
The shipping package should include all of the following items
o
MVP•X instrument
o
Blue sensor box which includes:
One primary sensor blanking plug
Two secondary sensor blanking plugs
o
USB stick with manuals and documentation
Inspect for damage
o
Check the cable for slices or gouges
o
Check the connector sockets for corrosion, dirt, and salt deposits
o
Check the pressure case for dents and scrapes
o
Check the sensors for cracks or bends
Ensure all the Xchange™ sensors are installed tightly. The blue locking sleeve should be
tight, and sitting less than 1 mm from the instrument end cap.
Connect the instrument to a computer with the data cable and perform a scan or monitor if
using SeaCast.
Returning an Instrument to the Factory
If shipping for repair or recalibration, obtain an RMA number from the service centre.
Pack the instrument in its original shipping box to prevent damage during shipping.
An RMA number can be requested using the contact options given in the Support section of this
manual.