PC Configurator Software | A-25
Perform an Automatic Calibration
Scheduled Auto Calibration
1. Click on
Configuration
_
Auto Cal Config
tab.
Figure 24. Calibration_Auto Cal Configuration screen.
Calibration Gas Duration
Define how long you want each
calibration gas to flow through the
sensor before switching the gases.
The RCU automatically switches
the span and zero calibration gases
based on the calibration gas duration
times you specify.
Be sure to allow enough time for the gases to stabilize when you define these times.
Calibration Frequency
in days
Calibration Start Date
Click on the calendar or click on PC
Date/Time.
Calibration Start Time
Hours:Minutes:Seconds
Auto Calibration Enabled
This must be checked.
Next Calibrations Date/Time
This date and time must be later than
the Calibration Date and Time.
Calibration gas values entered under the Configuration_Cal Gas
Values tab, are visible on the Set Cal Gas Values and Timers screen.
Verify the values set for calibration or edit, if necessary.
Содержание Thermox WDG-V
Страница 8: ...viii Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 16: ...xvi Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 22: ...1 6 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 34: ...2 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 57: ...Installation Guide 3 17 Figure 3 18 RCU flow diagram 3 Span Combustibles and Methane...
Страница 58: ...3 18 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 64: ...3 24 Thermox WDG V VC VCM with Blow Back Figure 3 20 Wiring...
Страница 73: ...AMEVision Display User Interface or Communications 4 5...
Страница 76: ...4 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 88: ...5 12 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 91: ...Service and Parts 6 3 Figure 8 1a Wiring diagram for sensor...
Страница 96: ...6 8 Thermox WDG V VC VCM with Blow Back Figure 8 3 Thermocouple replacement...
Страница 100: ...6 12 Thermox WDG V VC VCM with Blow Back Figure 8 5 Flow sensor replacement...
Страница 103: ...Service and Parts 6 15 Figure 8 7 Box Heater Replacement...
Страница 105: ...Service and Parts 6 17 Figure 8 8 Combustible Block Heater Replacement...
Страница 107: ...Service and Parts 6 19 Figure 8 9 Electronics Board Removal...
Страница 114: ...7 4 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...
Страница 118: ...A 4 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 126: ...A 12 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 132: ...A 18 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 137: ...PC Configurator Software A 23 Figure 23 Calibration_Calibration Results screen...
Страница 138: ...A 24 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 144: ...A 30 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 156: ...A 42 Thermox WDG V Series Analyzers This page intentionally left blank...
Страница 164: ...A 8 Thermox WDG V VC VCM with Blow Back This page intentionally left blank...