American Standard Ariana 6021 Скачать руководство пользователя страница 1

IN WALL PRESSURE BALANCING
BATH AND SHOWER SETS

M 9 6 8 4 5 7

B

To assure proper positioning in relation to wall,
note roughing-in dimensions. 

Thank you for selecting American-Standard...the benchmark of fine 

quality for over 100 years.

To ensure that your installation proceeds smoothly--please read these

instructions carefully before you begin.

ROUGHING-IN DIMENSIONS

Certified to comply with ANSI A112.18.1

Installation

Instructions

ARIANA

6021
6022

THREADED INLETS (STOPS)

INLETS

1/2" NPT

5-7/8"

INLETS 1/2" NPT

OUTLETS
1/2" NPT

OUTLETS
1/2" NPT

3-3/8"

3-3/8"

3-3/8"

THREADED INLETS

Required Tools

Flat Blade Screwdriver

Adjustable Wrench

Channel Locks

Plumbers' Putty or Caulking

Phillips Screwdriver

1

ROUGHING-IN

Turn off water at main supply.

CAUTION

When soldering, remove PLASTER GUARD, CARTRIDGES and CHECK STOPS (IF PRESENT). When finished soldering,
flush valve body, replace cartridges, check stops (if present) and plaster guard to continue installation. Use thread
sealant or Teflon tape on threaded connections.

NOTE

If the valve is installed on a fiberglass
or other thin wall application, the
PLASTER GUARD (4) can be used as a support.

Connect hot and cold water supplies.
Cap off shower pipe (5) and tub filler pipe (6).
For support, use pipe BRACES (7) secured to wooden braces.
With valve turned off, turn on water supplies. Check for leaks.

COLD

HOT

Cut a 3" dia. hole in the shower stall.
Drill two additional 1" holes to allow access
to the stops.
Remove PLASTER GUARD (4), rotate 90˚
so that indicated screw holes fit MANIFOLD (2).
Push CAP on valve, place ESCUTCHEON on and
attach with screws.

1

7

5

3

6

4

2

See Roughing-in diagram before starting.
Connections are:
   1/2" female NPT for threaded inlets
Connect RISER PIPE (1) to MANIFOLD (2)
top outlet marked "SHR".
Connect TUB FILLER PIPE (3) at bottom
outlet marked "TUB".
For proper positioning the finished wall
must be within side wall of PLASTER
GUARD (4).

FINISHED WALL

4"

BOTTOM OF TUB

74" FOR HEAD

CLEARANCE

5-1/8" REF.

7-7/8" REF.

18" OPTIONAL

5" REF.

1/2" NPT

1-5/8"

to

3-1/4"

1/2" NPT

7-1/8"

4

-

1

/4"

REF

.

OPTIONAL TO FINISHED

FLOOR USUALLY

BETWEEN 65'' AND 80''

TOP OF TUB RIM

Off

Hot

Содержание Ariana 6021

Страница 1: ...Use thread sealant or Teflon tape on threaded connections NOTE If the valve is installed on a fiberglass or other thin wall application the PLASTER GUARD 4 can be used as a support Connect hot and cold water supplies Cap off shower pipe 5 and tub filler pipe 6 For support use pipe BRACES 7 secured to wooden braces With valve turned off turn on water supplies Check for leaks COLD HOT Cut a 3 dia ho...

Страница 2: ...nterclockwise one number to limit hot water temperature Use ARROW 3 on CARTRIDGE 4 and NUMBERS 5 on HOT LIMIT STOP 1 for indication 1 5 1 5 4 4 3 3 2 2 1 2 3 4 Find correct position of HANDLE 1 and push HANDLE 1 onto VALVE STEM 4 Install HANDLE SCREW 2 and push in INDEX CAP 3 Check proper operation of HANDLE 1 Turn on water supply on and test installed fitting Operate valve and diverter spout A 2 ...

Страница 3: ...CK INSTALLATION ROTATE 180 Remove PRESSURE BALANCE UNIT 5 Remove CAPS 7 and clean valve thoroughly Examine balancing unit and check condition of O ring on end of piston Piston should move back and forth Order Repair Part M952100 0070A if balancing unit is defective Replace CAPS 7 and install PRESSURE BALANCE UNIT 5 Make sure inlets line up with two holes in bottom of casting Top flange should butt...

Страница 4: ...PRESSURE BALANCING BATH AND SHOWER SETS HOT LINE FOR HELP For toll free information and answers to your questions call 1 800 442 1902 Weekdays 8 00 a m to 8 00 p m EST IN CANADA 1 800 387 0369 TORONTO 1 905 306 1093 Weekdays 8 00 a m to 7 00 p m EST Product names listed herein are trademarks of American Standard Inc American Standard Inc 2004 M909732 YYY0A SPOUT ESCUTCHEON M950225 YYY0A DIVERTER S...

Отзывы: