
USER
MANUAL
914NG
U
SE
B.38
7845285-06 03/20
subject to change without notice
B.7.7
OPENING PROCEDURE
1) If the crane is in folded position, fully retract the 2nd boom cylinder (articulation cylinder).
2) Lift the 1st boom so that the 2nd boom can rotate freely.
3) Move the 2nd boom to the horizontal position.
1
2
3
Содержание 911NG 1S
Страница 2: ......
Страница 97: ...USER MANUAL 914NG TECHNICAL SHEET D 1 7845285 06 03 20 subject to change without notice D TECHNICAL SHEET...
Страница 172: ...USER MANUAL 914NG ANNEXES E 31 7845285 06 03 20 subject to change without notice LOCATION OF SAFETY SIGNS...
Страница 178: ...USER MANUAL 914NG ANNEXES E 37 7845285 06 03 20 subject to change without notice E 8 EC DECLARATION OF CONFORMITY...
Страница 179: ......