
USER
MANUAL
809NG
U
SE
B.34
7845469-01 03/20
subject to change without notice
B.7.9
CLOSING PROCEDURE
The operator should close the crane from the column side to avoid collisions with moving
parts of the crane.
1) Close the hydraulic extensions of the crane
2) Move the 1st boom so that the 2nd boom can rotate freely.
3) Rotate the crane column to the recovery direction.
1
2
3
Содержание 809NG
Страница 2: ......
Страница 83: ...USER MANUAL 809NG TECHNICAL SHEET D 1 7845469 01 03 20 subject to change without notice D TECHNICAL SHEET...
Страница 136: ...USER MANUAL 809NG ANNEXES E 27 7845469 01 03 20 subject to change without notice LOCATION OF SAFETY SIGNS...
Страница 142: ...USER MANUAL 809NG ANNEXES E 33 7845469 01 03 20 subject to change without notice E 8 EC DECLARATION OF CONFORMITY...
Страница 143: ......