
6.
Clean the cover seal and sealing surface
1
.
7.
close the hopper cover.
The fastener
2
is locked.
8.
Close the fastener.
CMS-I-00002596
6.5.5.2 Changing the metering roller
1.
Set the sliding shutter
1
to the bottom position.
CMS-I-00002586
2.
Insert the unlocking tool
2
into the metering unit
cover
1
.
3.
Unlock the metering unit cover on the metering
housing
3
.
4.
Open the metering unit cover.
CMS-I-00002582
CMS-T-00003598-D.1
6 | Preparing the machine
Preparing the implement for operation
MG6149-EN-GB | J.1 | 18.10.2022 | © AMAZONE
72