![Amazone Precea 3000-A Скачать руководство пользователя страница 120](http://html1.mh-extra.com/html/amazone/precea-3000-a/precea-3000-a_original-operating-manual_2919773120.webp)
NOTE
The removal recommendation applies to
implements with a hydraulic coulter pressure
system.
Depending on the row conversion that is
performed, new supply hoses for air and fertiliser
supply may be necessary.
Other conversion possibilities must be tested by a
specialist workshop.
To ensure optimal hose routing after removing
the PreTeC mulch seeding coulters,
see the table to determine the rows that must be
removed.
6.3.22.2 Disconnecting the energy supply
1.
Disconnect the ISOBUS from the tractor.
2.
To deactivate the coulter,
disconnect the coulter wiring harness
1
from
the implement wiring harness
2
.
3.
Take the bridge plug
3
out of the sealing kit.
4.
Connect the bridge plug to the implement wiring
harness.
CMS-I-00003830
6.3.22.3 Adjusting the hydraulic supply
1.
To unfold the implement,
see "Unfolding the implement sections".
2.
To set the coulter pressure to zero,
refer to the ISOBUS operating manual, "Adjusting
the coulter pressure".
3.
Lower the implement and move the three-point
hydraulic system of tractor into float position.
The coulter pressure cylinders retract and the
coulter pressure is relieved.
4.
Switch off the fan.
1
3
2
CMS-I-00007310
CMS-T-00005474-C.1
CMS-T-00005478-C.1
6 | Preparing the machine
Preparing the implement for operation
MG6659-EN-GB | F.1 | 25.10.2022 | © AMAZONE
114