![Amazone Hektor Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/amazone/hektor/hektor_operating-manual_2919762046.webp)
Overload safety
8.2.2
Hydraulic stone release with decentralised pressure setting
Before operation, the tripping pressure can be set independently for
each share.
For setting the pressure, use the intended pressure control hose with
pressure gauge.
Setting the tripping pressure
1. Couple the intended pressure control hose
to the tripping unit and tractor.
2. Open the stop tap on the hydraulic cylinder
(position I).
3. Actuate the tractor control unit.
Set the desired tripping pressure.
4. Close the stop tap on the drawbar hydraulic
cylinder (position 0).
5. Depressurise the pressure control hose.
6. Set all other shares in the same manner.
46
Hektor BAG0186.1 07.19
Содержание Hektor
Страница 32: ...Coupling and uncoupling the implement 32 Hektor BAG0186 1 07 19...
Страница 51: ...Cleaning maintenance and repair Hektor BAG0186 1 07 19 51...
Страница 65: ...Hydraulic diagram 12 Hydraulic diagram Hektor BAG0186 1 07 19 65...
Страница 66: ......