6.4.16 Using the loading board steps
REQUIREMENTS
The seed drill is coupled to the soil tillage
implement
1.
Hold the steps
2
in position.
2.
To unfold the steps,
release the transport lock
1
.
3.
Swivel the steps down.
4.
Climb onto the loading board
3
using the steps.
5.
After use, swivel the steps up and put them in the
parking position.
The transport lock locks automatically.
6.
Check whether the transport lock is properly
locked.
CMS-I-00004942
6.4.17 Preparing the metering unit for operation
6.4.17.1 Putting the metering unit into operation
If work is started without calibration,
Close the calibration flap
1
.
1
CMS-I-00006791
CMS-T-00007020-C.1
CMS-T-00009826-A.1
CMS-T-00010369-A.1
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
79
Содержание Centaya 3000 Special
Страница 6: ......
Страница 31: ...CMS I 00006976 CMS I 00006977 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 25...
Страница 32: ...CMS I 00006978 CMS I 00006984 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 26...
Страница 147: ...3 CMS I 00007038 10 Repairing the implement Lubricating the implement MG7508 EN GB B 1 31 08 2022 AMAZONE 141...
Страница 159: ......