4.
Switch on the tractor PTO shaft. Slowly couple
the tractor PTO shaft only at an idle or at low
tractor engine speed.
5.
To check the settings of the implement,
seed for approx. 30 m at working speed and then
check the work pattern.
NOTE
Perform the following visual inspections regularly,
e.g. after each reloading with seed:
Placement depth
Segment distributor heads
Coulters
Metering unit
7.5 Checking the placement depth
1.
Remove the fine soil
1
over the seed
2
.
2.
Determine the placement depth
3
.
3.
Cover the seed with fine soil again.
4.
Check the placement depth in several places in
a longitudinal and transverse direction relative to
the implement.
1
3
2
CMS-I-00003257
7.6 Turning on the headlands
NOTE
Lifting the implement causes the metering roller in
the metering unit to stop. When the fan is running,
seed emerges from the coulters until the conveyor
section is empty.
1.
To prevent seed accumulations,
give the tractor control unit for the fan drive
priority.
2.
To prevent lateral loads when driving in curves
on the headlands,
Raise the implement.
CMS-T-00004517-C.1
CMS-T-00004491-B.1
7 | Using the implement
Checking the placement depth
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
95
Содержание Centaya 3000 Special
Страница 6: ......
Страница 31: ...CMS I 00006976 CMS I 00006977 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 25...
Страница 32: ...CMS I 00006978 CMS I 00006984 4 Product description Warning symbols MG7508 EN GB B 1 31 08 2022 AMAZONE 26...
Страница 147: ...3 CMS I 00007038 10 Repairing the implement Lubricating the implement MG7508 EN GB B 1 31 08 2022 AMAZONE 141...
Страница 159: ......