10.1.8 Checking the rollers
INTERVAL
After initial operation
Every 200 operating hours
or
Every 3 months
Check the bolts
1
for tightness.
If the bolts need to be replaced,
pay attention to the alignment of the bolts.
Check the roller bearing
2
for ease of
movement.
2
2
1
1
CMS-I-00000099
10.1.9 Checking the top link pin and lower link pin
INTERVAL
daily
1.
Check the top link pins and lower link pins for
cracks or broken areas.
Permissible wear
2 mm
2.
Replace the pins if there is significant wear.
10.1.10 Checking the hydraulic hose lines
INTERVAL
After initial operation
Every 50 operating hours
or
weekly
1.
Check the hydraulic hose lines for damage, such
as chafing point, cuts, tears and deformation.
2.
Check the hydraulic hose lines for leaks.
CMS-T-00002329-D.1
CMS-T-00002330-G.1
CMS-T-00002331-C.1
10 | Repairing the implement
Maintaining the implement
MG6806-EN-GB | Q.1 | 26.07.2022 | © AMAZONE
67
Содержание Cenio 3000
Страница 39: ...CMS I 00003018 4 Product description Soil tillage tools MG6806 EN GB Q 1 26 07 2022 AMAZONE 35 ...
Страница 83: ......