6.3.3 Preparing the spring steel closer for operation
1.
Pull out the pin
1
.
2.
Slide the side element
2
into the desired
position.
3.
Fix the position of the side element with a pin.
4.
Secure the pin with a linch pin.
1
2
CMS-I-00003066
6.3.4 Preparing the edge levelling discs for operation
6.3.4.1 Adjusting the edge levelling discs
The working depth and penetration angle of the edge
levelling discs are adjusted to prevent the formation of
soil ridges during operation.
1.
Raise the implement.
2.
Loosen the bolts
1
.
The bearing journal and the hub of the edge levelling
disc
3
serve as handles.
3.
Turn the edge levelling disc to the desired
position.
4.
Tighten the bolts
1
.
5.
Loosen the bolts
2
.
6.
Move the edge levelling disc disc up or down.
7.
Tighten the bolts
2
.
2
3
1
CMS-I-00003276
CMS-T-00004169-D.1
CMS-T-00006609-D.1
CMS-T-00004545-D.1
6 | Preparing the machine
Preparing the implement for operation
MG6806-EN-GB | Q.1 | 26.07.2022 | © AMAZONE
50
Содержание Cenio 3000
Страница 39: ...CMS I 00003018 4 Product description Soil tillage tools MG6806 EN GB Q 1 26 07 2022 AMAZONE 35 ...
Страница 83: ......