30
A P P L I C A T I O N A N D O P E R A T I O N
E N
6
Application and Operation
6.1
Selecting the sintering program
▷
To select a program: Press the
key.
The list menu is indicated.
Fig. 9
Display, list menu
▷
In the list, select the desired program with the
keys
-or-
▷
directly select the program by pressing the
key and the respective number key.
▷
To take over the program: Press the
key.
The display switches to the operating level.
▷
To display the segments of the program: Press
the
key.
Before starting-up the furnace, it should
acclimate at the set-up location for 24
hours. Swift heating up in cold condition
can cause damage to the heating elements
(for example, burning-through).
During the first heating up, there may be
odour nuisance due to binding agent
fumes escaping from the insulation mate-
rial.
▷
Provide for thorough ventilation of the
furnace set-up location when heating up
for the first time.
WARNING:
Danger of fire and explosion!
The furnace surfaces become very warm.
▷
Do not place objects on the furnace!
NOTE:
Insufficient sintering results due to faulty tem-
perature control!
▷
Prior to every process, visibly check the ther-
moelement for damage.
DANGER:
Hot air at the outlet opening!
▷
Do not reach with your hand at or above the
outlet opening.
▷
Do not place objects on the furnace!
▷
Do not hang objects directly above the fur-
nace!
P
1
2
3
4
5
6
7
8
9
0
abc
def
mno
wxyz
+_-
jkl
tuv
ghi
P1 zirconia standard
P2 zirkonia fast
P3 zirkonia slow
pqrs