background image

INSTALLATION

INSTRUCTIONS

ProLine PL60

HEAVY FRAMELESS BYPASS
BATH ENCLOSURE

Copyright © Alumax Bath Enclosures 2020.  All rights reserved.

G03980847

9-3-20

Содержание ProLine PL60

Страница 1: ...INSTALLATION INSTRUCTIONS ProLine PL60 HEAVY FRAMELESS BYPASS BATH ENCLOSURE Copyright Alumax Bath Enclosures 2020 All rights reserved G03980847 9 3 20 ...

Страница 2: ... use of bathrooms vary widely Alumax does not control the selection of product configurations operating hardware or glazing materials and assumes no responsibility for such ALUMAX DOES NOT MAKE ANY OTHER REPRESENTATIONS OR WARRANTIES EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF MERCHANTABILITY OR ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE TO THE EXTENT ANY ...

Страница 3: ...breaking or shattering USE CAUTION WHEN HANDLING GLASS PANELS Safety tempered glass is very resistant to breakage but it can still break if unequal pressure is placed on it during installation or if cutting of the glass is attempted In addition the sharp corners of the panels can damage tile and floor coverings or cause injury BEFORE BEGINNING INSTALLATION Unpack your unit carefully and inspect fo...

Страница 4: ...L Center Guide M Center Guide Anchor N Center Guide Insert O Center Guide Screw P Roller Insert Q Roller R Door Glass Panel S Roller Plastic Washer T Roller Screw U Roller Backing Plate V Glass Mount Threaded Rod W Glass Mount Plastic Washer X Outer Glass Mount Y 1 4 x 1 1 2 Glass Mount Screw Z Inner Glass Mount AA Glass Mount Insert BB Stopper CC Stopper Set Screw DD Sleeve Set Screw EE Wall Seal...

Страница 5: ...sition and the screw centered in the block 3Bar Length Measure the width of the fixed glass panel F Subtract 2 3 8 from that dimension Measure from the center of the middle hole in the bar to the fixed panel end of the bar and cut that end off The fixed panel end is the one with the second hole in it Now subtract 1 3 4 from the measurement taken in step 1 which is the overall width of the shower o...

Страница 6: ... the hole until fully seated Mount the Glass Clips I with the Glass Clip screws J Install the Vinyl K into the Glass Clips 6Center Guide At the middle of the centerline make a mark ap proximately 2 long and 1 1 16 to the inside of the enclosure Place the Center Guide L on the new mark centered on the middle of the centerline Mark the center of the attachment holes and remove the Center Guide Drill...

Страница 7: ...f the edge and the inside of the panel facing down Place the Header Bar on the Fixed Panel with the holes facing up Using a thin rod or straightened wire coat hanger push the Glass Mount Threaded Rods V into the end of the Header Bar and line one up with each hole in the bar Put a Glass Mount Plastic Washer W on the Outer Glass Mount X and put the 1 4 x 1 1 2 Flat Head Screw Y through them both an...

Страница 8: ...n the Wall Mount Sleeves Once you have the Header Bar set as you want it and the Fixed Panel positioned correctly tighten the Wall Mount Set Screws then the Glass Mount Screws 10Door Panel Installation Lift the Door Glass R and place the rollers on the bar making sure to get the bottom edge of the Door Glass into the Center Guide To adjust the Rollers up or down the Door Glass will have to be remo...

Страница 9: ... until it touches the top roller on the strike side of the door Tighten the Stopper Set Screw CC with the bumper in the up position Move the door to the open position with the handle 1 4 1 2 from hitting the fixed panel Slide the other stopper over until it just touches the top roller on the fixed side of the door Tighten the Stopper Set Screw with the bumper in the up position 13Finishing Up Make...

Отзывы: