DRAG BOX
User Guide
LW.LH/10.21
Страница 1: ...DRAG BOX User Guide LW LH 10 21 ...
Страница 2: ...our position as the largest supplier of scaffolding fencing and access products to negotiate the best rates for you We guarantee you will get the best value products and service when you hire or buy from us BEST PARTNERSHIP We provide a full range of engineering design and business services to partner and work with our customers Talk to us today about how we can help you to grow your business BEST...
Страница 3: ...Drag Box Introduction 3 Assemble 3 4 Install 5 Adding a Top Box 6 Extraction 6 Safety Tips 7 Ancillaries 8 Disclaimer Copyright Disclaimer 9 Copyright 9 Contents ...
Страница 4: ...n handling and installing boxes and accessories Altrad Generation Hire and Sale excavation systems can be supplied with a full range of additional safety products including ladder access and guardrails as well as various other ancillary products These products are designed to act in accordance with the practice of Shoring Equipment and meet the requirements of the Lifting Operations Lifting Equipm...
Страница 5: ...and Pins 7 Insert pins into designated holes and secure with R Clips 4 Insert the struts into the pockets and lock in place with Pins and Clips 6 Lower the second panel pockets facing downwards onto the upraised struts you have just installed and lock in place 8 Insert the struts into the pockets and lock in place with Pins and Clips ...
Страница 6: ...a section of pipe pull the drag box with the bucket through the trench Continue until pipe laying is complete Backfill and compact to underside of bottom frame and remove Repeat for top frame and backfill to ground level then extract sheets 2 Lift the Drag Box into the trench 4 Dig in front of the box ...
Страница 7: ...2 Lift the box so these panel connectors hang down 3 Locate the panel connectors in the top of the base panel 4 Then pin through connectors and panel 5 Secure with these with R Clips A Attach a lifting chain to one lifting point and pull B Repeat this for each corner C Until the box can be pulled out using the straight pull ...
Страница 8: ...s struts clips and pins Boxes should never be left flying above the base of the excavation Leave 100mm of the box above ground level on the base top box Refrain from bearing weight with the bucket in the middle of the panel during installation Only access the box via ladder access Never move the box whilst personnel are inside the excavation Do not use any un supported part of the trench as access...
Страница 9: ...7000 Panel Height mm 1800 2500 2500 Panel Thickness mm 100 100 100 Minimum External Trench Width mm 900 900 900 Maximum Internal Trench Width mm 3200 3200 3200 Clearance Between Struts mm 4520 4520 6620 Max Clearance Below Bottom Strut mm 1072 1500 1500 Maximum Weight kg 2370 3020 4550 Standard Working Load 25kn m2 25kn m2 25kn m2 ...
Страница 10: ...cal changes and Generation UK Ltd does not accept any liability for any inconvenience loss or damage caused as a result of any inaccuracy or omission within this publication Copyright No unauthorised reproduction of any images text or other matter contained herein is permitted All rights are expressly reserved including copyright design right moral and patent rights where applicable We reserve the...
Страница 11: ...10 sales altradgeneration com Notes ...
Страница 12: ...sford 01277 841 670 Chichester 01243 558 290 Croydon 0208 6896044 Frimley 01252 838 696 Grays 01375 312 120 London E 020 7473 6056 Luton 01582 491000 London W 01895 527666 West Thurrock 020 7476 4760 Reading Coming Soon SOUTH EAST Cardiff 029 2046 3835 Cardiff Docks 029 2079 1188 WALES Kings Lynn 01553 771 465 Norwich 01603 309 010 EAST ANGLIA Gateshead 0191 490 6866 Newcastle 0191 492 1190 NORTH ...