![Alternate Heating WOOD GUN Super E210 Скачать руководство пользователя страница 15](http://html.mh-extra.com/html/alternate-heating/wood-gun-super-e210/wood-gun-super-e210_installation-and-operators-manual_2910961015.webp)
v nting p rformanc will b b tta r with larg r stov
pip .
The smok hood is turn d on manually as n d d,
typically just b for op ning th load door to add
fu l. Smok is most commonly s n wh n th load
door is op n d with consid rabl fu l still l fte
burning in th fier box. Smok scap is also common
wh n r fractory is at good op rating t mp ratur
and th fier box is b ing fiell d compl t ly.
INSTALLATION OF BOTTOM INSULATION
The r will b four pi c s of fieb rglass insulation
board s nt with your Wood Gun. Two of th pi c s
will b 1.5” thick and two will b 1” thick. Onc
boil r is in plac and l v l d…
1. slid th two 1” pi c s und r th boil r from th
r ar on on ith r sid of th drafte motor.
2. Push th m both toward th c nt r of th boil r.
You will nd up with a 2-3” gap in th c nt r of th
boil r b tw n th two pi c s of insulation.
3. Slid th skinni r 1.5” insulation into th l fte
sid on top of th 1” pi c . K p it as clos to th
out r sid of th boil r as possibl .
4. The last pi c of insulation will hav to b
install d from th front by r moving th v rtical
acc ss pan l locat d to th l fte of th loading and
insp ction doors. Us a 3/8” nut driv r to r mov th
s lf-tapping scr ws.
5. Slid th 1.5” insulation board into th cabin t
k ping th conduit abov or to th l fte.
6. Onc th insulation board is ins rt d all th
way, push it ov r and down toward th bottaom
c nt r of th boil r. On sid will r st on th 1” board
install d arli r and th oth r sid will r st on th
insulation board laying on th flaoor of th cabin t.
General Chimney Introduction
On of th most important consid rations in
installing a boil r is th typ of chimn y that will b
us d. The condition and construction of th chimn y
is important to providing sufficci nt drafte. It is v ry
important not to conn ct to a chimn y/flau s rving
anoth r applianc .
CAUTION: DO NOT TO CONNECT THIS
UNIT TO A CHIMNEY/FLUE SERVING
ANOTHER APPLIANCE.
Specific Chimney Requirements for the
Wood Gun™
The Wood Gun™ cr at s its own drafte;
th r for
having sufficci nt h ight in th chimn y is not an
issu . Exc ssiv chimn y h ight can allow for mor
cooling of xhaust gas s and l ad to cond nsation
issu s. Oth r asp cts of chimn y construction that
l ad to cond nsation includ us of a masonry
chimn y that lacks an insulat d lin r. Having such a
chimn y on th outsid of th hous compounds this
probl m as w ll. B caus of th high fficci ncy of th
Wood Gun, and r sultant low stack t mp ratur s, it
is important to try to pr s rv xhaust h at. Always
ch ck with your local building insp ctor and
insuranc ag nt to assur complianc .
Stov pip should b siz d as follows:
✔
Sup r E210 = 6 IN diam t r.
Never decrease the cross-sectional
area of the stovepipe/chimney
because the velocity of the exhaust
will increase thus increasing the
likelihood of particle discharge in
the exhaust
Technical Aspects of Chimney Performance
- 9 -
Содержание WOOD GUN Super E210
Страница 2: ......
Страница 57: ...Appendix B Wiring Diagrams 51 ...
Страница 58: ...Appendix C Exploded Parts Drawings 52 ...
Страница 59: ... 53 ...
Страница 60: ... 54 ...
Страница 66: ...Appendix F Boiler Piping and Ducting Examples 60 ...
Страница 67: ...Wood Gun Air Inlet Ducting Installations 61 ...
Страница 70: ...APPENDIX G Markings 64 ...
Страница 71: ...Datalabel 65 ...