![Altendorf F45 ProDrive Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/altendorf/f45-prodrive/f45-prodrive_operating-manual_2910755076.webp)
Transport, siting and installation
76
Transport, siting and installation
0000010038-003- GB
5.4.2
Sub rollers on the sliding table
Check the sub-rollers
The sub-rollers must run smoothly against the start slope at the start and end of
the raceway. They should be set so that they can be held by hand with noticea-
ble force and that they slip while the sliding table is moved.
Setting of the sub-rollers
The sub-rollers have eccentric bearings and can be adjusted.
The sub-rollers are set so that they can be held by hand with noticeable force
and that they slip while the sliding table is moved. Adjusting them too tightly will
result in stiff movement of the sliding table, and can lead to unwanted cutting
results.
Repeat this process for all sub-rollers.
Fig. 5-41
Sub-rollers
Содержание F45 ProDrive
Страница 8: ...Identification 8 Identification 0000010038 003 GB EC prototype testing certificate...
Страница 9: ...Identification 9 0000010038 003 GB Identification...
Страница 10: ...Identification 10 Identification 0000010038 003 GB GS test certificate...
Страница 11: ...Identification 11 0000010038 003 GB Identification...
Страница 12: ...Identification 12 Identification 0000010038 003 GB DGUV Test Certificate...
Страница 13: ...Identification 13 0000010038 003 GB Identification...
Страница 14: ...Identification 14 Identification 0000010038 003 GB C US Certificate...
Страница 39: ...Definitions 39 0000010038 003 GB Definitions...
Страница 155: ...Operating 155 0000010038 003 GB Operating i Note For information on how to handle batteries see chapter 3 6 4...
Страница 189: ...Cleaning care 189 0000010038 003 GB Cleaning care i Note No relubrication of the saw shaft is necessary...