background image

 

Installation Instructions

 

Alpha Premier Pack Pro

 

(Part No. 3.028421)

 

For use with Alpha condensing boilers

 

 

 

 

Bottom cover 

& extension 

 

Fig 1. Kit contents 

 

1. INTRODUCTION

 

The Alpha Premier Pack Pro is only suitable for use with Alpha condensing boilers originally supplied with 

compression 

isolation valves only, and must be installed in accordance with these instructions and the installation instructions supplied 
with the boiler.

 

The kit comprises of a wall jig fitted with a magnetic cyclone and pipe clips, wall template, flow and return split tails, bottom 
tray, screw pack and wall spacers. The wall jig has been designed to be fitted to the wall before the boiler, allowing the 
pipework to be pre-fitted. The pipework can be installed vertically upwards and downwards using the copper tail 
connections supplied on the jig.

 

Note: As the wall jig adds 45 mm to the depth of the boiler, clearances and flue measurements need to be adjusted 
accordingly.

 

 

2. INSTALLATION

 

 

a. Fit the Wall Jig - See Fig. 2 

Tape the wall template to the wall in the required position, making sure it is level. Mark the positions of the eight fixing 
holes for the wall jig as shown on the template and mark the flue position.

 

Out of the eight holes marked choose four that are suitable then drill the four holes using a 10 mm drill. Insert the wall 
plugs provided or use suitable fixing for the wall material.

 

If a vertical or side flue is to be used, ensure that 45 mm is added to the distance from the centre of the flue hole to the 
wall on which the boiler is to be mounted. This is to allow for the depth of the wall jig. For horizontal flues use a 110 mm 
core drill cut the hole for the flue.

 

Secure the wall jig to the wall using the screws provided or suitable fixings for the wall material, ensuring it is level and flat 
against the wall. The wall spacers supplied may be placed between the wall and the jig if the wall is not flat.

 

Note: the jig must be flat against the wall and the boiler flat against the jig and ensure the sides A and B of 
the jig are vertical.

 

x 6 