1.4 External Structure
2.1 Package Verification
2.2 Installation Preparation
2.2.2 Cables & Materials
2.2.1 Tools
INTRODUCTION
MOUNTING
Unpack to check and verify following items after receiving the charger:
• Visual inspection on external appearance. In case there is any broken or damage,
notify the seller immediately.
• Check accessory type and quantity. If there is quantity in short or type inconformity,
make the record in time and contact the seller at once.
03
04
Multimeter
Electric drill
Tight the screws
Tight the bolts
Hole on the wall
Cut cables
Diagonal Pliers
Cross Screwdriver
(PH2x150mm, PH3x250mm)
Insulated Torque Wrench
Tool Name
Photo
Function
180mm
Check electrical connection and
electri-cal parameter
Power supply cable
5*6mm² three-phase
power sup-ply cable
Name
Specification
Quantity
Depend on actual requirement
Mounting
02
38mm
87mm
324mm
Communication cable
RJ45
Depend on actual requirement