7. INSTALLATION PROCEDURES
Cleaning Booth Installation
On supply this Booth will consist of either:
1. Booth, extractor & a length of flexible ducting.
2. Booth only. In this instance it is the customer responsibility to connect & supply adequate extraction. A minimum of 5m/s
of airflow is recommended under a blocked filter condition.
J
ET
B
LACK
S
AFET Y
- C
LEANING
B
OOTH
The Personnel Cleaning Booth is supplied with the JetBlack fitted and pre-wired.
•
Unpack the consignment and position the main Booth assembly in place.
•
Remove 4x Black Transport brackets from the base. Fit the 4x M16 feet and level.
•
Fix anchor brackets & feet (via knock-outs under chrome top cap) to floor as required.
•
Wire Live, Neutral & Earth as shown in the diagram below. Wire according to the rating plate (located at the back of the
Booth) to a fused supply.
•
EARTH THE BASE SECTION USING THE EARTH POINT PROVIDED AT THE REAR OF THE BOOTH.
•
Plug the Extractor leads into the Booth sockets and check operation.
PLEASE BE AWARE THAT ANY EXTERNAL
EXTRACTION SYSTEM SHOULD BE RUNNING BEFORE THE CLEANING STATION IS OPERATED.
•
The interior light and extractor (if supplied) is operated by a PIR & is factory set.