PAGE 57
ALMAC s.r.l.
This allows collisions between the lower part of the JIB and the ground to be avoided.
To activate this function simply select Dynamic levelling ON in the selector (5 ).
The boom will automatically rise up to an angle of 5° when the translation is selected.
When the boom reaches the 5° angle, the machine will start to move.
The mobile push-button panel can be removed and the machine is controlled by an operator
on the ground:
with the platform in transport position, the operator can move the machine
directly from the ground using the portable push-button panel (see photo below).
In the radio version, the machine control system prevents the aerial part of the machine from
being raised beyond the transport conditions if the radio control is not placed in the basket in the
appropriate housing.
If the radio control is not placed in its housing but the platform load is less than 20Kg, it is in any
case possible to lift the aerial part beyond the transport conditions.
In this case, the indication "RADIO OUT BASKET" appears on the display.
Attention
: The control panel can be dismantled and can only be used outside the platform by the
operator to use the platform exclusively in the TRANSPORT position.
Once the push-button panel has been removed from its seat in the basket, use the shoulder strap
provided to fix it to the operator's body in a steady and safe manner to avoid manoeuvring errors.
Содержание AlmaCrawler JIBBI 1250 EVO
Страница 40: ...PAGE 40 ALMAC s r l 1 2 3 1 2 3 ...
Страница 47: ...PAGE 47 ALMAC s r l ...
Страница 74: ...PAGE 74 ALMAC s r l ...
Страница 77: ...PAGE 77 ALMAC s r l 3 3 2 Radio mobile control push button panel if present ...
Страница 80: ...PAGE 80 ALMAC s r l 3 3 3 Push button panel display cable version and radio version ...
Страница 117: ...PAGE 117 ALMAC s r l 12V system fuse To determine the function of each individual fuse refer to the wiring diagram ...
Страница 210: ...PAGE 210 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Страница 212: ...PAGE 212 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Stamp and signature ...
Страница 228: ...PAGE 228 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...